. O, OPERATING DATA REPORT DOCKET NO. 050-0298 DATE 9-4-80 COMPLETED BY L L. Ballinger TELEPHONE R25-3811 OPERATING STATUS Cooner Nucionr station NS

1. Unit Name:

4

2. Reporting Pe iod: August 1980 2381
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 836
5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe):

778

_64 e

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None L

l

- 9. Power Level To Which Restricted. If Any (Net MWe): 635 MWe (Net) i 10. Reasons For Restrictions. If Any: Temocrarv tu rbi n a modif4cueinns reaufrino ren1acamant of cracked blades and discs with baffle plate resulted in reducsd generating capacity.

This Month Yr..to.Date Cumulatise 744.0 5,855.0 54,096.0

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 730.8 3,544.7 44,782.0 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 698.0 3.450.4 43.926.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0-
16. Gross Thermal Energy Generated (MWH) 1 64R A46 o 7 179 17R 0 81.562.054.0
17. Gross Electrical Energy Generated (MWH) 411.942.O _, 2.197.923.0 26.736.771.0
18. Net Electrical Energy Generated (MWH) 394.934.0 2.112.149.0 25,770.426.0 19.' Unit Service Factor 93.8 58.9 81.2
20. Unit availability Factor 93.8 58.9 81.2
21. Unit Capacity Factor (Using MDC Net) 69.5 47.2 ,

62.4

22. Unit Capacity Factor (Using DER Net) 68.2 46.4 61.2
23. Unit Forced Outage Rate 6.2 2.5 4.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:

None

25. If Shur Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed i

INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION py q 8009160: 2h

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0298 UNIT Cooper Nuclear Stat.

DATE 9-4-80 P. L. Ballinger COMPLETED BY .

TELEPHONE 402-825-3811 MONT11 August 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 546 g7 427 2 545 gg 560 3

388 ,9 623 4 105 20 621 0 625 5 21 a 219 22 625 7 402 23 615 S 571 24 593 9 607 25 628 10 589 26 607 l1 604 27 604-12 604 ;g 627 13 603 29 603 14 582 30 604 gg 582 33 604 16 514 INSTRUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(Q/77)

W

IX)CKET NO 050-0298 UNirSilUIDOWNS AND POWER REDUC 110NS U hN9-4-80r N'M a>n r S ab DATE u ust COMPLETED BY _ P- T.. Rn114ngny REPORI MON T11 1ELEPHONE An? n9s qaii

--, jg 3 E I.icensee E-t, 'L Cauw & renrective No. Dale S

o. E2 5 .355 Event 3?

ifiG o- 8 V

Atti"n to ji 5 j ;f3 g Report sr Peevent Recunence 6

80-09 800803 S 0 11 NA NA NA NA Power was reduced to allow adjustment of the control rod pattern.

80-10 800804 F 46 A 3 50-298-80-31 CD ZZZZZ An electrical storm caused a line fault ou 345 KV distribution system and subsequent voltage transients affected the turbine control system computer. !!ain steam pressure control was lost, a Group I isolation occurrec on low pressure and the reactor scram-med on MSIV closure. No corrective action is planned at this time, but evaluation of the electrical circuitry to prevent transients from affecting the plant's operation is being studied .

i l 2 3 4 17: Forced Itcason: Muhod: Exhibit G-Instructiims d S: Sdieduled A Equipment Failure (Explain) 1-Manual for Piepaution of Data ll-Maintenance of Test 2-Manual Scram. Entry Sheets for I icensee C. Refueling 3 Automatic Sciam. Event Reposi(LI R) Fde (NURIG D-Regulatosy Restriction 4-Other (Explain) 0161) li Operator 1 raining & license lixamination itAdministrative 5 G-Operational Estne (Explain) INhibil 1 Same Source 19/77) Il Other (Explain) e s

i OPERATIONS NARRATIVE August 1980 A scheduled power reduction was made on August 3,1980 to adjust the control rod pattern.

On August 4, 1980, an electrical storm caused a line fault on the 345 KV -

distribution system and subsequently caused a reactor scram and unit shutdown. During the startup, a leaky reactor feed pump seal extended the outage. The unit returned to normal power operation on August 6, 1980 and operated the remainder of August with no unscheduled or sched-uled power reductions.

l l