ML19343A114

From kanterella
Jump to navigation Jump to search
Forwards Proprietary & Nonproprietary Versions of Westinghouse Computer Printout Data Entitled Low Pressure Turbine Disc Info, in Response to NRC 800827 Request. Proprietary Version Withheld (Ref 10CFR2.790)
ML19343A114
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/04/1980
From: Parker W
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19268D039 List:
References
NUDOCS 8009160261
Download: ML19343A114 (2)


Text

-

I'

'g

-a

~

76Sh

}O<

t DUKE POWER COMPANY Powra Burmtwo 42n SocTa Caracu STazzr. CaAntoTTE. N. C. asa4a

.. w a

o. ** ansa.s a.

September 4, 1980 WCE P9ESsOEm'

?t'.g *= C n g:Aaga704 Sesam psocuc, ion 3734:e3 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. B. J. Youngblood, Chief Licensing Projects Branch No. 1 Re: McGuire Nuclear Station Docket No. 50-369

Subject:

Low Pressure Turbine Dise Integrity

Dear Mr. Denton:

Please find attached information on the low pressure turbine disc integrity as requested by a letter dated August 27, 1980 from Mr. Robert L. Tedesco of your Staff. Please a se us if you have any questions.

/

1 V

truly yours, s

i u-

- O,

)

William O. Parker, Jr.

LJB:ses Attachment

.l f

gf

$lW 8009160 1 h h

< dL '

MCGUIRE NUCLEAR STATION UNIT 1 Response to NRC Telecopy of August 21, 1980 Low Pressure Turbine Disc Integrity I.

A.

Westinghouse turbine - 1800 RPM Tandem Compound, Sextuple Flow Serial Numbers: Unit 1 No. 1 LP 23-A-4352 No. 2 LP 23-A-4353 No. 3 LP 23-A-4354 B., attached, is a computer printout of the requested data.

This information is proprietary and is accompanied by an l

af fidavit signed.lar Mr. R. W. Gaul of Westinghouse which requests that this information be withheld from public disclosure. is a non-proprietary version of the information.

I I.~ Preservice inspection has not been performed on any of the McGuire LP l

turbine rotors.

III. Westinghouse has indicated that LP turbine discs 1 thru 4 have sufficient moisture in the hub to cause a propensity for stress corrosion cracking.

IV.

Critical structures exposed to turbine missiles were designed to with-l*

stand their impact. To minimize exposed structures, a peninsular turbine l

orientation was used. -Refer to the following McGuire FSAR sections for a i

description of our analysis and evaluation.

Sections 3.5.1.2, 3.5.2.7, 3.5.5, 3.5.6 Sections 10.2.2, 10.2.3, 10.2.4, 10.2.5 l

r-%

m-.2

_-