ML19342A663
| ML19342A663 | |
| Person / Time | |
|---|---|
| Site: | 05200002 |
| Issue date: | 03/30/1993 |
| From: | Mike Franovich Office of Nuclear Reactor Regulation |
| To: | Miraglia F, Murley T, Russell W NRC |
| References | |
| NUDOCS 9304070228 | |
| Download: ML19342A663 (5) | |
Text
.
ph-c6J
-/
\\,,
UNITED STATES
+b
~
NUCLEAR REGULATORY COMMISSION o
3 p
WASHINGTON.D C.20555 m
"%,,,,,/a March 30, 1993 Docket No.52-002 MEMORANDUM FOR:
T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow M. Virgilio F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Richardson W. Bateman, EDO T. Gody, Acting B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo G. Holahan C. Rossi THRU:
Richard W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:
Michael X. Franovich, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
DAILY HIGHLIGHT - FORTHCOMING HEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (PIPING AUDIT)
DATE AND TIME:
April 6, 1993 (8:30 a.m. - 5 p.m.)
April 7 and 8, 1993.(8 a.m. - 5 p.m.)
LOCATION:
-Duke Engineering & Services, Inc.
230 South Tryon Street Charlotte, North Carolina 28201-1004 PURPOSE:
Meeting to discuss the CE System 80+ piping analyses, distribution, and design acceptance criteria. A proposed agenda is enclosed.
I 9304070228 930330 '""
r-m n 0;-W
{DR ADOOK 05200002i eID&'W C D--Ih3GkLU)I'l y
PDRf-b hO ELL' s
.'4 March 30, 1993
- PARTICIPANTS *:
NRC ABB-CE M. Franovich S. Ritterbusch S. Magruder J. LaRussa D. Terao L. Gerdes S. Hou et al.
G. DeGrassi (BNL)
P. Bezler (BNL)
J. Braverman (BNL)
P. Chen (ETEC)
(Original signed by T. V. Wambach for)
Michael X. Franovich, Project Manager Standardization Project Directorate.
Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
- Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of.the public who wish to attend should contact me at (301) 504-1121.
DISTRIBUTION:
Docket File PDST R/F SBajwa, 12G18 RBorchardt PDR TEssig TVWambach MXFranovich SMagurder.
PShea-OPA EJordan, 3701 GGrant, E00 ACRS (11)
P0' Dell, PTSB JMoore, 15B18 NRR Mailroom, 12G18 GBagchi, 7H15 DTerao, 7H15 Shou, 7H15 MPratt, 7E4
.AChaffee, 11A1 GZech, RPEB 1
0FC:
LA:PDST:ADAR.PM:P)S g g SC:PDST:ADAR PShe h y h/jfrYnohichtsg TEssig/ d NAME:
A 03h93 03/JC/93 DATE:
03/ 0/93 3
OFFICIAL DOCUMENT COPY: CM0406.MXF
' i 4
p L'
ABB-CombcGion Engineering,-Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing-ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut- 06095-0500 Mr. C. B. Brinkman, Manager-Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch-Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U. S. ' Department of Energy NE-42 Washington, D.C.
205B5 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington,'D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite ~100 Washington, D.C.
20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge
~2300 N Street, N.W.
Washington, D.C.
20037-1128
4; w.
~
1..
.i r
..NRC AUDIT OF ABB-CE
'1
^
SYSTEM 80+ DISTRIBUTION SYSTEM.
DESIGN ACCEPTANCE CRITERIA AND SAMPLE ANALYSES-APRIL 6-8, 1993, CHARLOTTE, NC-j PROPOSED AGENDA
-l t
Tuesday, April 6, 1993 8:30 a.m.
Introduction l
Agenda agreement i
ABB-CE opening remarks j
NRC opening remarks j
l 10 CFR Part :52. process, ITAAC, CAC, sample analyses, and piping" benchmark progress.
Background Presentation l
12:00 noon Lunch t
1:00 p.m.
Distribution Systems Design Guide Overview
. Piping. stress analysis criteria, includid loads; load-combinations, design parameters, fatigue, evaluation, thermal oscillations, etc.
l{
Piping support criteria, including: applicable codu,.-loads,--
I
=
load combinations, design considerations, good engineering..
practice, etc.
~
o High energy line break criteria; Leak-Before-Break-(LBB) criteria N
Comments l
,)
Piping criteria for Elimination of OBE from Design Codes,.rodt
[
Cases, Standards and Design Specifications Intersystem LOCA dssign.
for Low Pressure Piping (this item may be covered on Nednesday)
- n Wednesday, April.7.L1993 8 00 a.m.
Audit Review of Piping Analysis Calculations j
Pressurizer Surge Line Shutdown Coling Line -
3 Direct Vessel InW,tinn Line
=
Feedwater-Econemu er iine Main Steam Line j
=
Enclosure d
1 m
q
=
., Audit Review of LBB Calculations
,1
- Pressurizer Surge Line
~~
~. Shutdown Cooling Line Direct Vessel Injection Main Steam Line.
Main Coolant Loop Piping 12:00 noon Lunch 1:00 p.m.
Continuation of audit Thursday, April 8, 1993 8:00 a.m.
Continuation of audit 12:00 noon Lunch 1:00 p.m.
Discussion of Generic Piping Design ITAAC Design.and. Analysis of:
HVAC Systems and Cable Tray Closure' Process of DSER Open Items related to Piping /LBB F
Follow-up Action Items Conclusions Adjourn 9
~. -.
t
]
r
?
M