ML19341D615

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-328/81-05 on 810212-15.No Noncompliance Noted
ML19341D615
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 03/06/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19341D616 List:
References
NUDOCS 8104080016
Download: ML19341D615 (2)


See also: IR 05000328/1981005

Text

/$

Ysn u%

/

UNITED STATES

o

89-

NUCLEAR REGULATORY COMMISSION

o

$.

E

REGION 11

% . . . . . /[

101 MARIETTA ST., N.W., SUITE 3100

f$3

ATLANTA. GEORGIA 30303

c

'

N,

.

MAR 6

1981

4

y{d ;f;' y

1-

(

/

h

%

..

'A '/,3 i

'

Tennessee Valley Authority

',,

j %,D .

',

-

ATTN:

H. G. Parris

J

Manager of Power

500A Chestnut Street Tower II

D

A

%

.

p:e ,

~

n

4/

Chattanooga, TN 37401

' xp.g/y

,

Gentlemen:

Subject: Report Noh/31AU3)

This refers to the routine inspection conducted by H. L. Whitener of this office

on February 12-15, 1981, of activities authorized by NRC Construction Permit No.

CPPR-73 for the Sequoyah facility and to the discussion of our findings held with

K. Clark at the conclusion of the inspection.

Areas examined during the inspection and cur findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

perso.9el, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Feoeral. Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any ;information. that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear' from you within the 'specified period, the report'

will be placed in the Public Document Room.

Should you have any questions concerning this letter. we will be glad to discuss

them with you.

Since

ly,

'

.d,n

i

Dire or

Division <[f Resident and Reactor

Project Inspection

Enclosure: -(See page 2)

,

5

e g_

~8104080OMr

.

-

-

.

9

Tennessee Valley Authority

2

MAR 6

1981

Enclosure: Inspection Report No.

50-328/81-05

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballenti:.e, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. J Green, Division Director

.

.

.

I