ML19341D472

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-285/80-24 on 801201-31.No Noncompliance Noted
ML19341D472
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/19/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Jones
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML19341D473 List:
References
NUDOCS 8103050648
Download: ML19341D472 (2)


See also: IR 05000285/1980024

Text

//C

c

%

UNITED STATES

,

ypg }

NUCLEAR REGULATORY COMMISSION

3~# /.. C

REGloN IV

' , ,

,

<,

611 RYAN PLAZA DRIVE. SUITE 1000

ARLINGTON, TEXAS 76011

January 19. 1981

In Reply Refer To:

  1. . - Q%

,-Go

Docket No. 50-285/80-24

,

,

{J ' "*140 s 7 Ok

12

Omaha Public Power District

'

ATTN: Mr. W. C. Jones, Division Manager -

-i

Froduction Operations

$\\

p'",y,Droer

--

"s

f

1623 Harney Street

C6

'

Omaha, Nebraska 68102

/

4

e

w

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Mr. D. L. Kelley of this office, covering the period of December 1-31, 1980,

of activities authorized by NRC Facility Operating License DPR-40, and to the

discussions of the finding by the inspector with members of your staff at the

conclusion af each segment of the inspection.

Areas examined during the inspection and the findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If the report

contains any information that you believe to be proprietary, it is necessary

that you submit a written application to this office, within 20 days of the

date of this letter, requesting that such information be withheld from public

disclosure. The application must include a full statement of the reasons

why it is claimed that the infomation is proprietary.

The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

M 0305O(o'Q

Q

.

,

.

Omaha Public Power District

2

January 19, 1981

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

-

Sincerely,

kl$Wo

'G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclet ure:

IE Inspection Report No. 50-285/80-24

cc w/ enclosure:

S. C. Stevens, Manager

Fort Calhoun Station

Post Office Box 98

Fort Calhoun, Nebraska

68102

,,

I

I

i

. _ _ ,

_