ML19341D393

From kanterella
Jump to navigation Jump to search
Forwards LER 81-001/03L-0
Date released: 12/21/2019 Download: ML19341D393


LER 81-001/03L-0:on 810129,during Surveillance Testing, HPCI Sys Initiation Reactor Level Switch Actuated at Simulated Level Above Tech Spec.Caused by Components Slipping Due to Loose Set Screws on Actuator Pointers
ML19341D401
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/27/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341D401 (2)
Forwards LER 81-001/03L-0
ML19341D392
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/27/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341D392 (1)