Forwards IE Insp Rept 50-395/80-39 on 801216-19.No Noncompliance Noted
ML19341D076
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/30/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19341D077 List:
References
NUDOCS 8103040821
Download: ML19341D076 (2)


See also: IR 05000395/1980039

Text

k

nur

5" /

UNITED STATES

E'

NUCLEAR REGULATORY COMMISSION

o

'#

E

REGION li

f

101 MARlETTA ST

N.W.. SUITE 3100

ATLANTA, GEORGIA 30303

-

JAN 3 0198;

++***

m

o

South Carolina Electric and Gas Company

. ATTN:

T. C. Nichols, Jr. , Vice President

(

\\\\

Power Production and Systems Operations

U

A

Ug

(/

4

P. O. Box 764

- '

-

"

2/Sg

3

Columbia, SC 29218

a s

Gentlemen:

%

'D't

k' ~>k T g c

7

Subject: Report N

80-3h

a

This refers to the routine inspection safety conducted by

E. H. Girard of this

office on December 16-19, 1980, of activities authorized by NRC Construction

Permit No. CPPR-94 for the Summer facility, and to the discussion of our findings

held with 0. S. Bradham at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulaticas, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full ste?.ement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

docucent. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

!

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

l

t

,

C. E. Murph

ief

l

Reactor Construction and Engineering

l

Support Branch

- Encl.,sure :

(See Page 2)

poao4012h

-- . . .

.

. .

.

.

.

. . . . . . -

,

- n

i

South Ca'slina Electric and Gas

-2-

-Compar.

N 3 0 $7

~ Enclosure:

Inspection Report.No. ~ 50-395/80-39

cc w/ enc 1:

-

.A.

A. Smith,. Site QA Coordinator

O. S..Bradham, Manager

-

Nuclear Operations

J. B. Knotts,~Jr.

f

..

2

L

4

i

+

e

1

e

!-

,--

,

(

-

1

h'

l

t.

oI.

!

l.

.

.,

-

-

. . . . -

.

. . . .

. .

.

.

. .

. . .

. ._<