ML19341D021

From kanterella
Jump to navigation Jump to search
Forwards LER 81-003/03L-0
Date released: 12/21/2019 Download: ML19341D021


LER 81-003/03L-0:on 810129,conventional Waste Plant Discharge Flow Monitor Found Inoperable.Caused by Inaccurate Flow Readings Due to Inability of Instrument to Measure Continuous Discharge Flow.New Equipment Ordered
ML19341D025
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/28/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341D025 (3)
Forwards LER 81-003/03L-0
ML19341D020
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/26/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341D020 (1)