Forwards IE Insp Rept 50-271/80-18 on 801202-04.No Noncompliance Noted
ML19341C875
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/31/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19341C876 List:
References
NUDOCS 8103040345
Download: ML19341C875 (2)


See also: IR 05000271/1980018

Text

.

'

fw

[

%g

UNITED STATES

%

-' g

NUCLEAR REGULATORY COMMisslON

g

j

REGION I

se

g

$31 PARK AVENUE

of

KING OF PRUSSI A. PENNSYLV ANI A 19406

Docket No. 50-271

M

i

Vermont Yankee Nuclear Power Corporation

>

9

4

JQq ISSf g

-.

ATTN:

Mr. Robert L. Smith

_

Licensing Engineer

d

u.,,,

4 j'4 w ,,

25 Research Drive

O

m

o

d

Westborough, Massachusetts 01581

Gentlemen:

D

Subject:

Inspection 50-271/80-18

This refers to the routine inspection conducted by Peter S. Koltay of this

office on December 2 - 4, 1980 at the Vermont Yankee Nuclear Power Station,

Vernon, Vermont of activities authorized by NRC License No. DPR-28 and to the

discussions of our findings held by Mr. Koltay with Mr. Warren Murphy and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report con-

tains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within'20 days to this

office to withhold such information from public disclosure.

Any such application

must be accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

s10804O W

Q

-

- ._.

-

- - - -

-

._.

.-

--

.

.

Vermont Yankee Nuclear Power Corporation 2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

En. closure: Office of Inspection and Enforcement Inspection

Report Number 50-271/80-18

cc w/ encl:

Mr. Warren P. Murphy, Plant Superintendent

Mr. W. F. Conway, Vice President and Manager of Operations

Mr. J. E. Griffin, President

Mr. L. H. Heider, Vice President

,

i

--

. , , . ,

. , . - , , .