ML19341C791
| ML19341C791 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/27/1981 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| LSO5-81-01-038, LSO5-81-1-38, NUDOCS 8103040192 | |
| Download: ML19341C791 (3) | |
Text
.
-=
+
s y-DISTRIBUTION
- g Docket NSIC l
NRC PDR TERA ss7i',g ACRS (g/ (>
N,,
.)
Local PDR Docket No. 50-245/336 ORB Reading 9
.e
,C',],,.$la^hi
);)' f,
DEisenhut RPurple Y,
y TNovak
g C.g. 73 -' g l-l Mr. W. G. Counsil Vice President 7/
.C. $.;), ',;?
RTEdesco
{Q v7.3 y,
Nuclear Engineering and Operations
\\chn~"4 '%
',S/
ELainas Northeast Nuclear Energy Company DCrutchfield Post Office Box 270 Artford, Connecticut 06101 JShea N/ Jd.. _.g ;, '
HSmi th
%Qy,
Dear Mr. Counsil:
OELD OI&E (3)
We are continuing our review of the Training and Qualification Plan dated August 1979, and request that you respond to the comments contained in the enclosure to this letter.
i f
Your response is requested within 30 days of your receipt of this letter.
Sincerely, 1
Dennis M. Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page i
8103 040102 ORB #5.DL:
I j
e,,:rg.DL:......
..i......
... {..
t 4s uon JShea:cc
- DCr c(field l we 1:2.. r f,
l
. l..
~
...j.
i-a n.. m:.4 " ' o CFFICIAL RECORO COPY m m-n
- &pa ss
- g _j4, UNITED STATES NUCLEAR REGULATORY COMMISSION g -) T s.(, g WASHINGTON, D. C. 20555 '
,, c,(;e p'ef at } g/; y s
- g ' \\ '. a?
January 27,'1981 Docket No. 50-245/336 LS05-81-01-038 f
4 Mr. W. G. Counsil, Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company Post Office Box 2Te Hartford, Connecticut 06101
Dear Mr. Counsil:
We are continuing our review of the Training and Qualification Plan dated August 1979, and request that you respond to the comments contained in the enclosure to this letter.
Your response is requested within 30 days of your receipt of this letter.
Sincerely, ka77/.
Dennis M. Crutchfield, hief 4
Operating Reactors Branch #5 Division of Licensing Encl os ure:
As stated cc w/ enclosure:
See next page a
-I e
--3
Mr. W. G. Counsil January 27, 1981 CC 3
William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors at Law Research and Folicy One Constitution Plaza Developaent Hartford, Connecticut 06103 Department of Planning and Energy Policy Natural Resources Defense Council 20 Grand Street 91715th Street, N. W.
Hartford, Conne:ticut 06106 Washington, D. C.
20005 Director, Criteria and Standards Division Northeast Nuclear Energy Cocpany Office of Radiation Programs ATTN: Superintendent (ANR-460)
Millstone Plant U. S. Environmental Protection P. O. Box 128 Agency Waterford, Connecticut 06385 Washington, D. C.
20460 Mr.. lames R. Himmelwright U. S. Environmental Protection Northeast Utilities Service Company Agency P. O. Box 270 Region I Office Hartford, Connecticut 06101 ATTN: EIS COORDINATOR JFK Federal Building Resicent Inspector 30ston, Massachusetts 02203 c/o V. S. NRC P. O. Box Drawer KK Niantic, Connecticut 06357 Waterford Public Library Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterf ord, Connecticut 06385 John F. Opeka Systeas Superintendent Northeast Utilities Service Coapany P. O. Box 270 Hartford, Connecticut 06101 4
ENCLOSURE C0! GENTS ON MILLSTONE GUARD TRAU'ING plan l
1 4
'Our review of_ the plan indicates that it requires only a limited number of revisions to be acceptable.
Soecf fic Comments 1.2.1.3B Add the following information within this section of the plan:
"The require-i ment for a member of the security force to use a hearing aid shall not decrease the effective performance of the individual assigned security job duties during normal or emergency operations".
1.5 Delete the reference to (1 25%).
1.6 Add to this section a commitment that the documents completed during initial j
and requalification examinations will be retained for at least a two year period.
~
2.2.6 Add to this section a commitment that test results will be documented and retained on site for at least a two year period.
2.4 Cele.e the reference to (i 255).
3.0 Add a reference to night firing for fadiliarization.
Del:te the reference to (+ 25%).
4.1 Since the handgun course is not the National Police Course, identify the equivalent nationally recognized course used.
- ' 6 4.3 Delete the reference to (125%).
5.3 Within this section, list the personal equipmer,t reetinc the requirements of Appendix B. V. 5.
General Commen s The Job Analysis Appendix I Worksheets must include the crucial guard
~
functions and duties identified in NUREG-0574 The specific sections requiring revision are identified as follows:
CAS/SAS Operator 3.1.1
'3.1.3 Guard 3.2.1 - 3.2. 5 3.3.1 - 3.3.7 4
3.4.1 - 3.4.2 3.5.1 4
.-