ML19341C368
| ML19341C368 | |
| Person / Time | |
|---|---|
| Site: | Phipps Bend |
| Issue date: | 01/02/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19341C369 | List: |
| References | |
| NUDOCS 8103030172 | |
| Download: ML19341C368 (2) | |
See also: IR 05000553/1980017
Text
Tf0_.,
[p ury'o$
UNITED STATES
.
8'i
'
NUCLEAR REGULATORY COMMISSION
E
REGION 11
$..
[
101 MARIETTA ST.. N.W.. SulTE 3100
o,
j'
ATLANTA, GEORGI A 30303
'
- ....
Jh!
2y
In Reply Refer To:
9
RII:JLC_.
'
s
d[553180-1L.)
q~
/ ,,
J,"
k .,
,
.
I
,
/
FEB 0 G 1981 '" >
JLL
Tennessee Valley Authority
p'
-
ATTN:
H. G. Pacris
73
.'
Manager of Power
500A Chestnut Street Tower II
- A* p"*
fg
3,+ .
Chattanooga, TN 37401
sf
i#
Gentlemen:
/
m!
This refers to the inspection conducted by J. L. Coley of this office on November 17 20,
1980 of activities authorized by NRC Construction Permit No. CPPR-162 for the
Phipps Bend Nuclear Plant facility, and to the discussion of our findings held
with W. P. Kelleghan at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
5
sn
eA -
_ h
C. E. Murphy, Chief
i
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
8103030/78
4
L
Tennessee Valley Authority
-2-
J A ,'.'
J 3y3;
Enclosure:
Inspection Report No.
50-553/80-17
cc w/ encl:
W. P. Kelleghan, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear
Safety Review Staff
i
>