ML19341C208
| ML19341C208 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/19/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19341C209 | List: |
| References | |
| NUDOCS 8103020384 | |
| Download: ML19341C208 (2) | |
See also: IR 05000483/1980030
Text
{{#Wiki_filter:f% TX C- ' 4 UNITED STATES e [ 3 .,3 NUCLEAR REGULATORY COMMISSION g
- a
REGION 111 ' '
799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 6o137
- ...*
JAN 1 g 1981 h o e' Docket No. 50-483 R[[p1 s 1 < A ] Union Electric Company ' g'14s, g% lfy EEB g U ATTN: Mr. John K. Bryan Vice President - Nuclear - C Post Office Box 149 St. Louis, MO 63166 C 8 3 f,/ 4 7q[w1 Gentlemen: This refers to the inspection conducted by Messrs. G. A. Phillip and F. C. Hawkins of this office on December 11-12 and 18-19, 1980, of activities at Callaway, Unit 1, Construction Site, authorized by NRC Construction Permit No. CPPR-139 and to the discussion of our findings with Mr. Weber and others of the Callaway staff at the conclusion of the inspection. The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personnel. No items of noncompliance with NRC requirements were identified during ~ the course of this inspection. We understand that you intend to take the necessary actions, in light of the identified concrete imperfections, to assure the capability of the Unit I reactor building exterior dome slab to meet design requirements. In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room, except as follows. If this report contains information that yeu or your. contractors believe to be proprietary, you must apply in writing to this office, within twenty-five days of the date of this letter, to withhold such information from public disclosure. The application must include a full statement of the reasons for which the information is considered proprietary, and should be prepared so that proprietary information identified in the application is contained in an enclosure to the application. P 8103 02 0Mf .
- . . Union Electric Company -2- .We will gladly discuss any questions you have concerning this inspection. Sincerely, A'7A $ G. Fiorelli, Chief Reactor Construction and Engineering Support Branch Enclosure: IE Inspection Report No. 50-483/80-30 cc w/ encl: W. H. Weber, Manager Nuclear Construction Central Files Reproduction Unit NRC 20b PDR -Local FDR- NSIC TIC Regions I & IV K. Drey Ronald Fluegge, Utility Divison, Missouri Public Service Commission }}