Forwards IE Insp Repts 50-445/80-27 & 50-446/80-27 on 801101-1231.No Noncompliance Noted
ML19341B907
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/15/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML19341B908 List:
References
NUDOCS 8102280111
Download: ML19341B907 (2)


See also: IR 05000445/1980027

Text

/e orc %,

.

UNITED STATES

[W

k

NUCLEAR REGULATOMY COMMISSION

7 f )^(-

i) S

I/ 2 j

REGION IV

3 .

,

k, , g

[

611 RYAN PLAZA DRIVE. SUITE 1000

ARLINGTON, TEXAS 76011

,, ,,

January 15, 1981

In Reply Refer To:

RIV

Docket No. 50-445/Rpt. 80-27

g

50-446/Rpt. 80-27

?

4

-,, p

s

-

.h

'

ll(i J

l

U

Texas Utilities Generating Company

@ 0 9 1981 *' f

>

ATTN: Mr. R. J. Gary, Executive Vice

-1

President and General Manager

v+ %'u"7

'

o

2001 Bryan Tower

s

e

Dallas, Texas 75201

_ R &

O

x

Gentlemen:

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. R. G. Taylor, during November and December 1980, of activities authorized

by NRC Constr,uction Permits No. CPPR-126 and 127 for the Comanche Peak facility,

Units No. I and 2, and to the discussion of our findings with Mr. R. G. Tolson

of your staff at the conclusion'of the inspection.

- Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations were identified.

'We have.clso examined actions you have taken with regard to previously identi-

f

fied inspection findings.

The status of these' items .is identified in paragraph

-

2 of-the enclosed report.

i

-

_

l

One new unresolved item is discussed in paragraph 6 of the enclosed report.

l

l

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed.in the NRC's Public Document Room.

If the

-report contains *any information that you believe to be proprietary, it is

l

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from -

L

public-disclosure.

The application must include a full statement of the reasons

l-

why'it is claimed that the information is -proprietary.

The application should

l

1

m

8102'280111:

L

_

.-

-.

. . - . . .

.

.

. .

- - .

_

_

- _ _ _ -

. - -

.

r

-

.

,

Texas Utilities Generating

Company.

-2-

January 15, 1981

.

be. prepared so th t any proprietary information identified is contained in an

,

enclosure to the application, since the application without the enclosure will

,

also be placed in the Public Document Room.

If we do not hear from you in this

>

regard within the specified ceriod, the report will be placed in the Public

Document Room.

!

Should you have any questions concerning this inspection, we will be pleased

>

to discuss them with you.

i

Sincerely,

.

/

.,f

I

'b-

,

'd. C. Seidj'e., Chief

l

Reactor Construction and

Engineeridg Support Branch

,

a

!-

Enclosure:

IE Inspection Report No. 50-445/80-27

t_

50-446/80-27

c :.w/ enclosure

sexas Utilities Generating Company

AiTN: Mr

H. .C. Schmidt, Project Mar,ager

2001 Bryan Tower

Dallas, Texas 75201.

x--

.

. -. . .