ML19341B674

From kanterella
Jump to navigation Jump to search
Forwards LER 80-080/03L-0
Date released: 12/21/2019 Download: ML19341B674


LER 80-080/03L-0:on 801225,w/pressure Vessel Head Removed for Refueling,Operating B Train RHR Became Inoperable When Loop Suction Valve Closed.Caused by Signal from Pressure Transmitter Loop.Valve Reopened
ML19341B675
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/28/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341B675 (1)
Forwards LER 80-080/03L-0
ML19341B673
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/28/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341B673 (1)