ML19341B599

From kanterella
Jump to navigation Jump to search
Notifies That Final Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp, Will Be Forwarded by 810121
ML19341B599
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 01/14/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-23, NUDOCS 8102030072
Download: ML19341B599 (1)


Text

.

(g]L s,

~

DUKE POWER COMPANY

110 iRCJ; Powra 13 cts.Dixo "TI 422 Sourn Cucacu Sinzzi, CnAntorTz, N. C. asa4a

'. I j[@l l 9 Al!

  • LlI wi wa.a o. e4 = n e n. s n.

January 14, 1981 VsCg Pogsiccat Tgg g ewo% g:Anta 704 Straw Paoove'iom 373-4063 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II

/_%

101 Marietta Street, Suite 3100 fy

/

I p' M. N '

\\

Washington, D. C.

20555 f(iC,0bhL) h, j jpdi ?.T Sb' g *;ctax n Re: RII:JPO

/N McGuire Nucle Station-og.,D Docket No 369, and 50-370 4

Dear Mr. O'Reilly:

In reference to IE Bulletin 80-23, all necessary information from our vendor is not yet available. We now expect to provide a final response to IE Bulletin 80-23 by January 21, 1981.

Very truly your,

f William O. Parker, Jr.

h RWO:ses cc: Director Division of Reactor Operations Inspection Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 u -

ao79-

-.