TI L o,
UNITED STATES 8
},
NUCLEAR REGULATORY COMMISSION E
REGION 111 o,
[
799 ROOSEVELT RCAD o@
GLEN ELLYN, ILLINOIS 60137 DEC 3 i G60 Docket No. 50-295 Docket No. 50-304 Commonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
As you are aware, the NRC published the Final Rule for emergency planning for both onsite and offsite preparedness in the Federal Register notice dated August 19, 1980 (45 FR 55402). This rule became effective on November 3, 1980, with implementation required by April 1, 1981, (except as provided in Section IV, page 3 of Appendix E).
One requirement which should be accomplished is_an exercise that tests the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations (li-censee, State, and local government)
Each licensee should conduct an emergency exercise within one year from April 1,1981, or prior to issuance of an Operating License.
In order for the NRC to make an assessment of this requirement, we plan to observe these major exercises for the new emergency plans. Accordingly, you are requested to pro-vide this office with a schedule of drills and exercises as soon as possible and to provide scenarios two weeks prior to the exercises or major drills.
Your cooperation with us is appreciated.
Sincerely, SY James -G. Keppler Director cc:
J. S. Abel, Director of Nuclear Licensing K. Graesser, Station Superintendent.
Central Files Reprodcction Unit NRC 20b AEOD Resident Inspector, RIII PDR Local PDR NSIC TIC Dean llansell, Office of Assistant Attorney General ~
81020sco gg a