ML19341B392
| ML19341B392 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 12/31/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Linder F DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 8102020034 | |
| Download: ML19341B392 (1) | |
Text
.
T/ (__
[ime
'o UNITED STATES
! "~
NUCLEAR REGULATORY COMMISSION n
d,k REGION lli o
799 ROOSEVELT RGAD o
GLEN ELLYN, ILLINOIS 60137 csc 3 3 m Docket No. 50-409 i
Dairyland Power Cooperative ATTN:
Mr. F. W. Linder General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
As you are aware, the NRC published the Final Rule for emergency planning for both onsite and offsite preparedness in the Federal Register notice dated 4
August 19, 1980 (45 FR 55402). This rule became effective on November 3, 1980, with implementation required by April 1,1981, (except as provided in Section IV, page 3 of Appendix E).
One requirement which should be accomplished is an exercise that tests the integrated capability and a major portion of the' basic -
elements existing within emergency preparedness plans and organizations (li-censee, State, and local government)
Each licensee should conduct an emergency exercise within one year from
+
April 1,1981, or prior to issuance of an Operating License.
In order for the NRC to make an assessment of'this requirement, we plan to observe these major exercises for the new emergency plans. Accordingly, you are requested to pro-vide this office with a schedule of drills and exercises as soon as possible and to provide scenarios two weeks prior to the exercises or major drills.
Your cooperation with'us is appreciated.
i Sincerely, ab /!'
ames G. Kepple"r-Director cc:
R. E. Shimshak, Plant Superintendent Central Files.
Reproduction Unit NRC 20b AE0D t
Resident Inspector, RIII PDR Local PDR NSIC TIC 1
John J. Duffy,.' Chief Boiler Inspector i
7f 810202nC"f4
~
.