g.
.
'
cf
%
UNITED STATES
.
NUCLEAR REGULATORY COMMisslON
. j
REGION I
e(3 4,
g
$31 PARK AVENUE
r
KtNC OF PRUS$t A, PENNSYL.V ANI A 19406
,
-
w wm
Docket No. 50-333
Power Authority of the State of New York
James A. FitzPatrick Nuclear Power Plant
ATTN: Mr. R. J. Pasternak
Resident Manager
P. O. Box 41
Lycoming, New York 13093
Gentlemen:
Subject:
Inspection 50-333/80-17
This refers to the routine inspection conducted by Mr. Peter S. Koltay of this
office on September 8-11, 1980 at the James A. FitzPatrick Nuclear Power Plant,
Scriba, New York of activities authorized by NRC License No. DPR-59 and to the
discussions of our findings held by Mr. Koltay with Mr. R. Pasternak and other
members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These items of noncompliance
have been categorized into the levels as described in our correspondence to you
dated December 31, 1974. This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2. Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved. Another activity appears to be a deviation frorr mmmitments made with
respect to implementing the facility Fire Protection /Preve1 tion Program.
This
item of deviation is discussed in the enclosed inspection report.
In your
reply, please include your comments concerning this item, a description of any
steps that have been or will be taken to prevent recurrence and the date all
corrective actions or preventive measures weri or will be taken.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures
will be placed in the NRC's O blic Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it
is necessary that you make a written application within 20 days to this
office to withhold such infonnation from public disclosure. Any such application
E J U . . o ON
,
.
'
.
.
,
Power Authority of the
State of New York
2
must be accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which
contains a statement of reasons which addresses with specificity the items
which will be considered by the Comission as listed in subparagraph (b)
(4)ofSection2.790. The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
)
we do not hear from you in this regard within the specified periud, the
report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
o
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-333/80-17
cc w/ enc 1:
George T. Berry, President and Chief Operating Officer
i
J. P. Bayne, Senior Vice President-Nuclear Generation
A. Klausmann, Director, Quality Assurance
M. C. Cosgrove, Site Quality Assurance Engineer
,
J. F. Davis, Chairman, Safety Review Committee
l
C. M. Pratt, Assistant General Counsel
l
G. M. Wilverding, Manager-Nuclear Licensing
,