ML19341A933
| ML19341A933 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 12/22/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Davidson D CLEVELAND ELECTRIC ILLUMINATING CO. |
| Shared Package | |
| ML19341A934 | List: |
| References | |
| NUDOCS 8101290486 | |
| Download: ML19341A933 (2) | |
See also: IR 05000440/1980027
Text
_ . . - . . . _ _ _ _ _ _ _ __
. _ _ -
_ _ _ _ - .
- _ _ _ _ _ _ . _ _ . _ . _ .
_m
.
-
_ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . _
__.
l
a
I
i
'
,1
%
- Gu
'o
U
i
,
! ' k , ',s g
i
NUCLEAR REGULATORY COMMISSION
s
o
2
' - E
REGION 111
- /
o, h
/
799 RooSEVE LT ROAD
- '
j
g ' .v
cLEN ELLYN. ILLINolS 60137
j
'
. ...
!
'DEC 2 2 80
\\1*
a1
D
i
g9
f
A
p"1
s
p[
J
h
Docket No. 50-440
Docket No. 50-441
,1
JAN 2188N Te
_
l
'
4
The Cleveland Electric Illuminating
v.s.e a u n uat w c q
k
- "55 "
]
Com?any
A
q
ATTN: Dalwyn R. Davidson
/
j
Vice President - System
t
g
j
Engineering and Construction
l
Post Office Box 5000
Cleveland, OH 44101
j
.
1
j
Gentlemen:
i
This refers to the inspection conducted by Mr. J. Hughes of this office
i
on November 1-30, 1980, of activities at the Perry Nuclear Plant Project,
!
Units 1 and 2, authorized by NRC Construction Pemits No. CPPR-148 and
No. CPPR-149 and to the discussion of our findings with Messrs.
M. R. Edelman and G. W. Groscup and others of your staff at the con-
4
!
clusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
4
]
during the inspection. Within these areas, the inspecti:a consisted of
a selective examination of procedures and representative records, obser-
'
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
i
the course of this inspction.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include.a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
infomation identified in the application is contained in an enclosure
to the application.
i
!
0 1 2 9 t) g
.
The Cleveland Electric
-2-
f
Illuminating Cecpany
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
4%"lMY"
,
G.
Fiore11i, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
IE Inspection Reports
No. 50-440/80-27 and
No. 50-441/80-25
cc w/encls:
central Files
Reproduction Unit NRC 20b
Local PDR
Harold W.
Echn, Power
Siting Commission
Mr. Daniel D. Wilt, Attorney
Helen W. Evans, State of Ohio
l
i
l
l
l
L