ML19341A728

From kanterella
Jump to navigation Jump to search
Forwards LER 80-118/03L-0
Date released: 12/21/2019 Download: ML19341A728


LER 80-118/03L-0:on 801231,position Indication 38-11 Showed Superimposed 3 Over 8 Digit When at Position 48.Caused by Reed Switch Problem in Rod Prototypic Inlet Piping Probe. Problem Will Be Corrected During Next Available Outage
ML19341A729
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/22/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341A729 (1)
Forwards LER 80-118/03L-0
ML19341A727
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/22/1981
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19341A727 (1)