Forwards IE Insp Repts 50-348/80-35 & 50-364/80-46 on 801001-31.No Noncompliance Noted
ML19341A236
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/04/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19341A237 List:
References
NUDOCS 8101220419
Download: ML19341A236 (2)


See also: IR 05000348/1980035

Text

.

[

[Q

_ N cCT, ^T/.TEC

,

.

7CC'.I AR REGUL/.TCR Y COMMISSICN

' _ (].}i f

-

u

.

' _!

.

7EGICN!!

'

., f f

.31 MARIC' TA ST. N W ,2 VITE 3100

.

ATL ANTA. GEORGIA 30303

'

DEC 0 41980

..-

In Reply Refer To:

RII:WHB

-

-

h o-348 M .

2

0-364/80-46)

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. H. Bradford of this office on

October 1 -31, 1980, of activities authorized by NRC License No. NPF-2 and NPF-8

for the Farley facility, and

t-

the discussion of our findings held with

W. G. Hairston at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report containa any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

$. C.

J

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

8101220y/y

q

.,

DEC 0 41980

'

Alabama Power Company

-2-

Enclosure:

Inspection Report Nos. 50-348/80-35

and 50-364/80-46

cc w/ enc 1:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

R. E. Hollands, Jr., QA Supervisor