Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
'
-... s' .
]
\_. / 1 VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL" REPORT 80-12 FOR THE MONTH OF DECDiBER, 1980 l
l 8101210$
OPERATING DATA REPORT DOCKET NO. 50-271 DATE 810113 COMPLETED BY D. Bernard TELEPHONE 617-872-8100 ext. 2390-OPERATING STAIUS_
- l. Unit Name: Vermont Yankee
- 2. Reporting Period: December
- 3. Licensed Thermal Power (Wt): 1593
- 4. Nameplate Rating (Gross We): 540
- 5. Dasign Electrical Rating (Net We): 514 (one-O 504 (ci ned) '
- 6. Maximum Dependable capacity (Gross We): 535 ,
- 7. Maximum Dependable Capacity (Net We): 504
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted,If Any(Nec We):
- 10. Rsasons For Restrictions, If Any:
This Month Yr--to-Date Cumulative
- 11. Hours In Reporting Period 744.00 8,784.00 ---
- 12. Number Of Hours Reactor Was Critical 110.50 6.377.39 57.535.78
- 13. Rsactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 73.70 6,273.80 55.601.58
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (WR) 30,933.00 9,378,904.00 78,603,517.00
- 17. Gross' Electrical Energy Generated (W R) 7.171.00 3.143.177.00 26.112.847.00
- 18. Nst Electrical Energy Generated (WH) 6.406.00 2.979.214.00 24 747 979 nn
- 19. Unit Service Factor o of 71 e 75_s1
- 20. Unit Availability Factor 9.91 71.42 76.61
- 21. Unit Capacity Factor (Using MDC Net) 1.71 67.29 67.65
- 22. Unit Capacity Factor (Using DER Net) 1.68 65.09 AA u
- 23. Unit Forced Outage Rate 90.06 13.11 7.31
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
L 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY UNIT P0kT.R LEVEL l i
4 DOCKET NO. 50-271 UNIT Vermont Yankee l
DATE 810113 -
1 l
CCMPLETD 3Y F.J. Burger 1 1
TELEPHONE 802-257-7711 Ext. 137 l i
MONTE December DAY AVERAGE DAILY POWER LE7EL DAY A7ERAGE DAILY PCWER LEVEL (MWe-Net) (MWe-Net) -
- 1. 0 17. 0
- 2. O la, 0
- 3. 0 19, 0
- 4. 0 20. 0
- 5. 0 ,1, 0
- 6. o 22. n
- 7. o 23. n
- 3. o 24. n
- 9. o 25. n
- 10. 0 2.. . o
, 11. 0 27. 0
- 12. 0 28. 15
- 13. 0 29. 73
- 14. 0 30. 90
- 13. 0 31. 89 l
l
- 16. O INSTRUCTIONS:
Cu :his fornac, list :he average daily uni: pcwer level in MWe-Ne: for each day in
- he reporting non:h. Ccmpute to che neares: whole negawatt.
l
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee REPORT MONTil December COMPl.ETED BY F.J. Burger TELEPilONE 802-257-7711 Ext. 137 Page 1 of 2 E7 ca 'o o y cause & Corrective No. Date y gg g gg License g .n I ""
a' O:0 $ .0 $ $ $3 E~8 Prevent Recurrence gv y g g n: Report # go go E g o S
80-22 801124 F 559.9 A* 4* 80-37/1T CG PIPEXX The pipe cracking is believed to have been (cont) caused by ICSCC. The Sweep-0-Let is under-going a failure analysis to determine the cause of the cracking.
The Sweep-0-Let and piping are being replaced with materials which meet the Intent of Section II of NUREG 0313, Rev. 1, dated October, 1979. -
I r: Forced Reason: Method: Exhibit G- Instructions S: Scheduled A-Equipment Failure (Explain) 'l- Manual for Preparation of l>ata ll-Ma tutenance or Test 2- Manual Scram Entry Sheets for Licensee C-Refueling 3- Automatic Scram Event Report (LER) File D-Regulatory Restriction 4- Other (Explain) (NUREG 0161)
E-Operator Training & License Examination ,.
F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
II-Other (Explain)
, ann
IINIT SilVTDOWNS AND POWER REDUCTIONS DOCKET NO 50-271 UNIT NAME Vermont Yankee REPORT MONTil December DATE 810113 COMPl.ETED BY F.J. Burger TEl.EPil0NE 802-257-7711 Ext. 137 Page 2 of 2 E9 m Y o y Cause & Corrective No. Date 'g ;jg g 7j g License gg .n H =
rt#
a M em m 8 M g U S
80-24 801225 F 106.9 A 4 N/A CF VALVEX Maintained reactor shutdown from previous scram to repair RllR System valve leakage.
80-25 801229 S 2.5 B N/A N/A N/A N/A Turbine Ge.wrator removed from the grid for oversp.ted testing.
I F: Forced Reason: Mettrod: Exhibit G- Instructions S: Scheduled A-Equipment Failure (Explain) 'l- Manual for Preggration of Data B-Haintenance or Test 2- Manual Scram Entry Sheets for Licensee C-Refueling 3- Automatic Scram Event Report (LER) File D-Regulatory Restriction 4- Other (Explain) (NUREG 0161)
E-Operator Training & License Examination 5
F-Administrative F.xhibit I - Same Source G-Operational Error (Explain)
II-Other (Explain)
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 810113 COMPLETED BY F.J. Bureer TELEPHONE 802-257-7711 Ext _ 117 SAFETY RELATED MAINTENANCE Page 1 of 5 NATURE OF MALFUNCTION ER OR OUTACE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "D" RilR Pump,P-10-ID Corrective N/A Normal Operation Seal Leakage Replaced Seal MR 80-0289 Instrument Isolation Corrective N/A Normal Operation Leakage Repacked Valve Valve V2-12B MR 80-0508 A-D kliR Pumps Corrective N/A NoL'al Operation Leakage Replaced Tubing and Connec-P-10-1A +1D Seal Water MR 80-0804 tions Supply Connections at pump suctions Containment Air Monitor Corrective N/A Shifted Valve Leakage Installed Re-designed Isolation Valve 76 A MR 80-0995 Internals Prevent- Valve Internals Supplied ed Closure by the Factory CRD liydraulic Control Unit Corrective N/A Normal Operation Air Leakage Replaced Solenoids and 14-31 Air Solenoids MR 80-1045 Rebuilt Valves
- 3 TIP Machine Containment Corrective N/A Normal Operation Leakage Replaced Seals Penetration MR 80-1051 CRD liydraulic Control Corrective N/A Set Point Drift Out of Calibra- Recalibrated Switch Unit 30-07 Alarm Pressure MR 80-1127 tion Switch RWCU line CUW-18 Corrective LER 80-37/IP 3ee LER Leakage Replaced Affected Compon-MR 80-1133 ents
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 810113 COMPLETED BY F.J. Burger TELEP110NE 802-257-7711 Ext. 137 SAFETY RELATED MAINTENANCE Page 2 of 5 NATURE OF MALFUNCTION ER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RilR Piping Support Corrective N/A Construction Rejectable NDT llD-200D Removed Indications MR 80-1134 Defects Indication on the Pipe to Saddle Welds llPCI Piping Support 11-31 Corrective N/A ' Normal Operation Loose Turnbuckle Tightened Turnbuckle MR 80-1153 Spring llangers llPCI-3 and Corrective N/A Normal Operation ti-107A, RilR llD-194C and Settings Out of Reset llangers MR 80-1187 Spec.
IID-87C. RR-65 and 66, CSilD-84 R11R Pumps P 10-1A rC Preventive N/A Updated Informa- Need for New Replaced Seals MR 80-1200 tion f rom the Type "0" Ring Factory RilR Minimum Flow Valve Corrective N/A Failed Breaker Valve Inoper- Replaced Breaker V10-16A MR 80-1246 able Shock Suppressor RilR-4 Corrective N/A Jarred During Fluid Leakage Rebuilt Suppressor MR 80-1255 Outage Maintenance Spring liangers RR 29 and Corrective N/A Normal Operation Setting Out of Reset llangers 30, RilR 11D-16 and llD 189 MR 80-1302 Spec.
o DOCKET NO. 50-271 UNIT Vermont Yankee .
DATE 810113 COMPLETED BY F.J. Burger TEI.EP110NE 802-257-7711 Ext.- 137 SAFETY RELATED MAINTENANCE Page 3 of 5 NATURE OF MALFUNCTION ER OR OMGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION "B" RPS !!G Set UV Relay Corrective N/A Worn Parts Did Not Trip Replaced Breaker MR 80-1316 "E" IRM Bypass Switch Corrective N/A Worn Parts Relay Inopera-Relsy Replaced Relay MR 80-1317 , ble Service Water Pumps Corrective N/A Normal Operations Out of Cal.
P7-1A ~ D Discharge 21eaned and Recalibrated MR 80-1347 3 ages.
Pressure Gages Service Water Pump P7-1A Corrective N/A Normal Wear Packing Leak Repacked Pump MR 80-1354 RWCU Valve V12-18 Corrective N/A Normal Wear Bonnet Seal Replaced Seal Ring MR 80-1360 Leakage Shock Suppressor Corrective N/A Normal Operation I.eakage at Sight RR 76 Refilled Reservoir and MR 80-1361 31 ass Tie.htened Fittings Reactor Drain Valve V2-99 Corrective N/A , Normal Operation Packing Leak Repacked Valve MR 80-1380 RilR Valve V10-81A Corrective N/A Normal Operation Packing Leak Adjusted Packing MR 80-1381 RllR Valve V10-46A Corrective N/A Normal Operation llonnet Leakage Replaced Gasket MR 80-1382
DOCKET NO. 3o-271 UNIT Vermont Yankee DATE 810113 COMPLETED BY F.J. Burger TELEP110NE 802-257-7711 Ext. 137 SAFETY RELATED MAINTENANPE Page 4 of 5 NATURE OF MALFUNCTION ER OR OU'I' ACE EQUIPMENT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION IIPCI Valve V23-19 Corrective N/A Normal Operation Packing Leak Adjusted Packing MR 80-1383 RCIC Valve V13-22 Corrective N/A Normal Operation Packing Leak
- Adjusted Packing MR 80-1384 Level Switch LS-6-52B Corrective N/A Normal Operation Tubing Joint Replaced Fittings MR 80-1385 Leak Lsvel Switch LS-2-3-72B Corrective N/A Normal Operation Tubing Joint Tightened Fittings MR 80-1386 Leak RCIC Valve V13-15 Corrective N/A Normal Operation Bonnet Leakage P.eplaced Seal Ring MR 80-1388 RCIC Valve V13-15 Corrective LER 80-43/3L Normal Operation Excessive Seat Lapped Disc and Seat v3 80-1408 Leakage "B" Diesel Pyrometers Corrective N/A Vibration Not Indicating
- 4 & #6 Cylinder Resoldered Connections MR 80-1437 RilR Valve V10-27A Corrective Outage 80-24 Normal Operation Excessive Seat Replaced Parts Ad Necessary MR 80-1442 Leakage R11R Valve VJ0-46A Corrective Outage 80-24 Normal Operation Excessive Seat Replaced Parts As Necessary MR 80-1443 Leakage
DOCKET No. 50-271 UNIT Vermont Yankee ,
DATE 810113 COMPLETED BY F.J. Burger TELEPHONE 802-257-7711 Ext. 137 SAFETY RELATED MAINTENANCE Page 5 of 5 NATURE OF MALFUNCTION LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RilR Valve V10-81A Corrective Outage 80-24 Failed Packing Leakage Repacked Valve MR 80-1454 9
~.*
DOCKET NO. 50-271 UNIT Vermont Yankee DATE 810113 C0XPLETED BY F.J. Burger TELEPH0:TE 802-257-7711 Ext. 137 December REPORT MONTH SLS ARY OF OPERATING EXPERIENC_ES_
Highlights Vermont Yankee operated at 2.6% of rated thermal power for the month.
Gross electrical generation was 7171 MWH or 1.8% of design electrical capacity.
Ocerating Sanmary The following is a chronological description of plant operations including other pertinent items of interest for the month:
12/1/80 At the beginning of the reporting period the plant was shutdown
[ for the replacement of Reactor Water Cleanup System piping.
12/23/80 At 1910 hrs. a reactor startup was initiated. Criticality was reached at 1950 hrs.
12/24/80 At 0752 hrs. the reactor scrammed due to a combination of a feedwater instrument failure and a malfunction of the turbine generator mechanical pressure regulator.
At 0852 hrs. the shutdown was continued to repair excessive valve seat leakage in the RHR system.
12/27/80 At 2050 hrs. a reactor startup was initiated. Criticality was re :hed at 2128 hrs.
12/28/80 At 1948 hrs. the turbine generator was phased onto the grid.
12/29/80 At 0939 the turbine generator was removed from the grid for overspeed testing. At 1207 the turbine generator was phased onto the grid.
Power was maintained at 23% due to the replacement of additional Reactor Water Cleanup piping.
, 12/31/80 At the end of the reporting cycle the plant was at 23% of rated l thermal power.
l L
i
.- . , .-