Forwards IE Insp Repts 50-329/80-33 & 50-330/80-34 on 801201-04.No Noncompliance Noted
ML19340E924
Person / Time
Site: Midland
Issue date: 12/30/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19340E925 List:
References
NUDOCS 8101160256
Download: ML19340E924 (2)


See also: IR 05000329/1980033

Text

.. . . y

,

..

,

et

.0

b [/d

p%

\\^7,

~

' T;i

UNITED STATES

<f

A

E' A

NUCLEAR REGULATORY COMMISSION

E

REGION 111

!

hij

6

3

,

g

8

799 ROOSEVELT ROAD

-4

CJ :?

E

GLEN ELLYN,ILLINolS 60137

r;

c

N

o

U

y

_

m

DEC 3 0 030

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. James W. Cook

Vice President

Midland Project

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the routine inspection conducted by Mr. C. M. Erb of this

office on December 1-4, 1980, of activities at Midland Nuclear Power Plant,

Units 1 and 2 authorized by hTC Construction Permits No. CPPR-81 and No.

CPPR-82 and to the discussion of our findings with Messrs. D. Turnbull,

T. Cooke, and others at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

l

2, Title 10, Code of Federal Regulations, a copy of this letter and the

l

enclosed inspection report will be placed in the NRC's Public Document

'

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons fbr which the information is

i

considered proprietary, and should be prepared so that proprietary

'

information identified in the application is centained in an enclosure

to the application.

8101160 g

.

.

_ _ - - .

_ .- -

. . . . . . .. -_

.

1

4

Consumers Power Company

-2-

1gEC 9 u

v.'.9

i

j

We will gladly discuss any questions you have concerning this

'

inspection.

S.incerely,

,

b-ana-

G. Fiore112, Chiet'

Reactor Construction and

Engineering Support Branch

Enclosure: IE Inspection

No. 50-329/80-33 and

No. 50-330/80-34

]

cc w/ enc 1:

Central Files

.

Reproduction Unit NRC 20b

l

PDR

Local PDR

NSIC

i

TIC

Ronald Callen, Michigan

Public Service Commission

!-

Myron M. Cherry

4

5

1

i

.

\\

i

(

)

s

,

1

I

.

,

-- i.