ML19340E797
| ML19340E797 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 12/09/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19340E798 | List: |
| References | |
| NUDOCS 8101150779 | |
| Download: ML19340E797 (2) | |
See also: IR 05000373/1980051
Text
N .S i G
'
.a ucg'o
UNITED STATES
4
~ * ,
\\=
8
NUCLEAR REGULATORY COMMISSION
,
- ., ,
g
i
g
c
REGION 111
Q,
[
799 ROOSEVELT ROAD
%
/
GLEN ELLYN,ILLINOld 60137
_,
~~- -
a c s
1sso
y
_
Le
r
D
[~ _ ,
~%
_
hh
Docket No. 50-373
.:l*
5
'
Commonwealth Edison Company
"
g
2
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
This refers to the routine inspection conducted by Mr. P. C. Lovendale of
this office on November 25-26, 1980, of activities at LaSalle County
Nuclear Station, Unit I authorized by NRC Construction Permit No. CPPR-99
and to the discussion of our findings with Mr. Diederich and others at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
The matter of valve and equipment locations near the radwaste decant tanks
has been referred to Headquarters for evaluation and possible action.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty-five days of the date of this letter, to
withhold such information from public disclosure. The ai, plication must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
8101150 7 7
- - . - _
._
- - _ _ -
.
5
i
Commonwealth Edison Company
-2-
g
EE0
<
I.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
l,
CLcu
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
!
i
Enclosure:
IE Inspection
Report No. 50-373/80-51
cc w/ encl:
i
J. S. Abel, Director
of Nuclear Licensing
L. J. Burke, Site
Construction Superintendent
T. E. Quaka, Qual'
Assurance Supei
.
R. H. Holyoak, Statron
Superintendent
B. B. Stephenson
Project Manager