ML19340E780
| ML19340E780 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/09/1980 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19340E781 | List: |
| References | |
| NUDOCS 8101150646 | |
| Download: ML19340E780 (2) | |
See also: IR 05000266/1980017
Text
[$a nogo
.
UNITED STATES
di
I
E'
NUCLEAR REGULATORY COMMISSIGN
'
n
2
A,
'
REGION lli
<!
'
'N
>
e
799 ROOSEVELT ROAD
- _
_,
j'
GLEN E LLYN, ILLINOIS 60137
~;j
.2
']
'
.....
g
a
y
a. m
9 %K
G
vi
9
4.
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
Executive Vice President
Power Plants
231 West Michigan
Milwaukee, WI 53201
Gentlemen:
This refers to the inspection conducted by Messrs. W. G. Guldemond and
R. L. Hague of this office on October 1-31, 1980, of activities at the
Point Beach Nuclear Power Plant authorized by NRC Operating Licenses
No. DPR-24 and No. DPR-27 and to the discussion of our findings with
Mr. G. A. Reed at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of a
selective examination of procedures and representative records, observations,
and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the
enclosures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain
information that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty-five days of the date
of this letter, to withhold such information from public disclosure. The
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
8101150 M f
-
- -
- -
-
-
-
- - - - - -
-
- - - -
-
-
-
-
_ _ _ _
_
_
_ _ _ . _ _ _ _ - - . - _ - -
- - - .
-
__
. . . -
_
_ .
i
0
Wisconsin Electric Power
-2-
I
We will gladly discuss any questions you have concerning this
j
inspection.
Sincerely,
' C?
/-
l' (Wt'<W
'
obert F. Heishman, Chief
,
Reactor Operations and Nuclear
Support Branch
.
cc w/ encl:
j
G. A. Reed, Manager
i
i
Central Files
1
Reproduction Unit NRC 20b
Resident Inspector, RIII
Local PDR
)'
'
Sandra A. Bast, Lakeshore
Citizens for Safe Energy
John J. Duffy, Chief
1
l
Boiler Inspector
Peter Anderson, Wisconsin's
Environmental Decade
,
T
.
.
-
- -
- - .
- -
.