Forwards IE Insp Repts 50-295/80-22 & 50-304/80-24 on on 801117-19 & Notice of Violation
ML19340E769
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/09/1980
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19340E770 List:
References
NUDOCS 8101150628
Download: ML19340E769 (2)


See also: IR 05000295/1980022

Text

.-.

__

.-.

-

_

7/t

-

pS RfC

4,,

UNITED STATES

'

!" 3

NUCLEAR REGULATORY COMMISSION

"

n

E

9E

REGION lli

3

'

'

..

O,

7&9 ROOSEVELT ROAD

y

n

% .'.b/

GLEN ELLYN,lLLINOIS 60137

$

-*

...

s

<a

'M

DEC 9

1980

-:

l j

i

to '

i

,

Qu'5

.['

55

Ik

1

Docket No. 50-295

f;

-

Docket No. 50-304

g

o

@

.

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine inspection conducted by Messrs. M. P. Phillips

,

and A. G. Januska of this office on November 17-19, 1980, of activities at

'

the Zion Nuclear Power Station, Units 1 and 2, authorized by NRC Operating

Licenses No. DPR-39 and No. DPR-48 and to the discussion of our findings

with Mr. K. Graesser and others of your staff at the conclusion of the

inspection.

It also refers to the December 5,1980, telephone conversation

between Mr. D. Howard of your staff and Mr. M. P. Phillips of our office

and to the subsequent telephone conversation that day between Mr. K. Graesser

,.

of your staff and Messrs. Phillips, Paperiello, Kohler and Spessard of our

I

office.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

In addition, our Mobile Laboratory was at the

site during the inspection to perform independent measurements of radio-

activity.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A

and a written response is required.

From the above telephone cenversations we understand that for all radioactive

effluent sample analyses performed, the " Summary of Peaks in Sample" will be

printed out and compared with the results to verify LLt all peaks found in

the gamma ray spectrum of radioactive effluents are identified and acccounted

for in the results.

8101150 g g

.

Commonweatlh Edison Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclesures,

and your response to this letter will be placed in the NRC's Public D( caent

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N'

W

A. B. Davis, Chief

Fuel Facility and

Materials Safety Bran,ch_,

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-295/80-22,

No. 50-304/80-24

cc w/cncl:

Mr. J. S. Abel, Dic;ctor

of Nuclear Licensing

Mr. K. L. Graesser,

Station Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

.

".s

- - - -

-

- -

. - -

- - - -

.