ML19340E645

From kanterella
Jump to navigation Jump to search
Forwards Suppl 4 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required
ML19340E645
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/18/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
References
NUDOCS 8101150220
Download: ML19340E645 (2)


Text

_ -. -.

TC N I,

p rec cf I

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

I REGION lli o

7M ROOSEVELT ROAD I

Y, GLE N E LLYN, ILLINOIS 60137 o

December 18, 1980 f

i l

t Gentlemen:

The enclosed IE Supplement No. 4 to Bulletin No. 80-17 is forwarded i

to you for information. No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

.}'JamesG.Keppler...,

! * :) ;)' I ' -

\\

,f Director

Enclosure:

IE Supplement No. 4 i

to Bulletin No. 80-17 f

t

.i i

0115 0 'a7 81

i Docket No. 50-341 The Detroit Edison Company ATTN: tir. Edward liines, Assistant Vice President and flanager Quality Assurance 2000 Second* Avenue Detroit, til 48226 cc w/ encl:

Central Files AD/ Licensing AD/ Operating Reactors AEOD Resident Inspector, Rill PDR Local PDR VTISIC TIC Ronald Callen, flichigan Public Service Conunission Eugene B. Thomas, Jr., Attorney

- - n