Grants Six Month Extension to Preliminary Design Approval for CESSAR Sys 80 Std Plant
ML19340E630
Person / Time
Site: 05000470
Issue date: 12/31/1980
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8101150145
Download: ML19340E630 (2)


Text

.

c 7

[

b. : jE C07

/

I 4

DEC 31180 Docket No. STN 50-470 Combustion Engineering, Inc.

ATTN: Mr. A. E. Scherer, Director h

Nuclear Licensing U

1000 Prospect Hill Road Windsor, Connecticut 06095

Dear Mr. Scherer:

SUBJECT:

TEMPORARY EXTENSION OF PRELIMINARY DESIGN APPROVAL As you are aware, the preliminary design approval (PDA) for the CESSAR System 80 standard plant (PDA-2) is about to expire. The NRC is currently considering new guidelines regarding PDA extensions. Therefore, we are administratively granting, by this letter, a six-month extension to your PDA until these guidelines can be developed and implemented.

Sincerely.

Original signsd by Earrell G. Eisenhtit Darrell G. Eisenhut. Director l

Division of Licensing cc: see next page DISTRIBUTION:

Docket Files, OELD, CReis JHeltemes, AE00 SSPB Rdg.

I&E (5)

NSIC L PDR BJones TERA NRC PDR BScharf (10)

JRMiller l

DEisenhut JWetmore ECase l

RPurple JSaltzman l

TNovak CHebron RTedesco ACRS(16)

Glainas OPA CMiles J01shinski RDiggs GIOI?50/M LTremper HDenton CGrimes RBallard

  • SEE PREVIOUS YELLOW FOR CONCURRENCE c crF..DL:SSPB*

..DL:SSPB*,,l,,DL:AD/L*

lD

, l, NRR 0 ELD

  • I scau-rf CGrimes/cc JMiller
RTedesco, CReis

,l, DR

,l, 12/ /80 ut !

se wr >

12./19/80 l 12/19/80 12/19/80 12/19/80 12

/80

. {'.

.t.

..: =:.u r a -: sc. s.:w ::"

C F.:!CIAL RICC R C CC..

N W

N I

Y V

V N...N Docket No. STN 50-470

\\

Corbustion Engineering, Inc.

ATTN: Mr. A. E. Scherer, Director

/

Nuclear Cicensing 1000 Prospect HillsRoad Windsor, Connecticu't 6095

Dear Mr. Scherer:

x

\\

SUBJECT:

TE.TORARY EXTEN$10H OF PRELIMINMY DESIGN, APPROVAL

\\

/

As you are aware, the preliminary design approvaf (PDA) for the CESSAR System 80 standard plant (PDA-2) is about to expire. The NRC is currently considering a new policy regardfhg PDA extensions. Therefore, we are at:inistratively granting, by this letter, a'six-month extension to your s

PDA until this policy can be developed an i@lemented.

N

\\

r Sipcerely,

/

\\

/

/

/

D. G. Eisenh t Director

,/

Division of th,:ensing cc: see page 2

/

/

/

/

/

l j

/

/

/

/

/

l

/

/

l

/

l

,i 1

p C

  1. b Y

J n

" cr >:, SSPB: [ jISPM.0L AD/L

,(,$,,,.,,,[....D.Ei.se nhu.t...

OELD,

D:DL NRR l

' ~ >'..cGr.wes.....ai.n e.r..

..RIedkco.

.ECase.,

  • r: F.12/..f.i../8012//..../.80 12/ O/.80 12/.d.../80 12/ /80 12/ /80 we r:aw re ic se, v:.. ::'o OFFICIAL RECORD COPY

'* * *- m

  • e neouq s

,p UNITED STATES j

7, NUCLEAR REGULATORY COMMISSION "j

WASHINGTON, D. C. 20555

%,...../

DEC 31 Igx Docket No. STN 50-470 Combustion Engineering, Inc.

ATTN: Mr. A. E. Scherer Director Nuclear Licensing 1000 Prospect Hill Road Windsor, Connecticut 06095

Dear Mr. Scherer:

SUBJECT:

TEMPORARY EXTENSION OF PRELIMINARY DESIGN APPROVAL As you are aware, the preliminary design approval (PDA) for the CESSAR System 80 standard plant (PDA-2) is about to expire. The NRC is currently considering new guidelines regarding PDA extensions. Therefore, we are administratively granting, by this letter, a six-month extension to your PDA until these guidelines can be developed and implemented.

Sincerely, O

Darrell G.(Eisenhut, Dlg rector Division of Licensing cc: see next page 1

l l

l l

f

i Combusticn, Engineering, Inc.

a l

ccw/ enclosure (s):