MONTHYEARML20206B9211999-04-23023 April 1999 Proposed Defueled Tech Specs Stating That Characterization of Revised Review & Audit Function Remain in Plant TS Rather than Be Transferred to Plant QA Plan ML20205N1821999-03-24024 March 1999 Proposed Tech Specs Deleting Condition 2.C(10) from Plant License ML20204E5701999-03-17017 March 1999 Proposed Tech Specs,Removing Section 6.7, Procedures & Programs & Section 6.9, Record Retention, from TS & Transferring to Yankee Decommissioning QA Program ML20204D9031999-03-17017 March 1999 Proposed Tech Specs Section 6.2.2,deleting Overtime Restrictions Currently Incorporated in Ynps TS ML20204E5241999-03-17017 March 1999 Revised Tech Specs,Consolidating Mgt Positions & Transferring Review & Audit Functions to Yankee Decommissioning QA Program ML20155A2561998-10-15015 October 1998 Proposed Defueled Tech Specs Re Required Frequency of Submittal of Radioactive Effluent Release Rept ML20237E3631998-08-20020 August 1998 Proposed Tech Specs,Removing Definition of Site Boundary from Subsection 1.10 of Definitions & Modifying Subsection 5.1 of Design Features ML20197D4341997-12-31031 December 1997 Rev 1 to Ynps License Termination Plan ML20216E2101997-09-0505 September 1997 Proposed Tech Specs,Modifying Defueled TS 3.1.3 to Allow Util to Continue W/Implementation of Ynps Decommissioning Plan Which Has Been Incorporated Into Ynps FSAR ML20141F6391997-05-15015 May 1997 License Termination Plan for Yankee Nuclear Power Station ML20198G6381997-02-0707 February 1997 Rev 12 to Ynps Off-Site Dose Calculation Manual ML20138Q5301996-10-31031 October 1996 Rev 11 to Off-Site Dose Calculation Manual ML20198S6131993-12-31031 December 1993 Partially Deleted Rev 9 to Edcr 93-303, Vessel Internals Segmentation Component Removal Program 1995 ML20198S5681993-08-0202 August 1993 Partially Deleted Rev 6 to Edcr 93-303, Reactor Vessel Internals Segmentation Component Removal Program 1993 ML20126E7601992-12-21021 December 1992 Permanently Defueled Tech Specs ML20058D8451990-10-29029 October 1990 Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage ML20058D8421990-06-30030 June 1990 June 1990 Reactor Containment Bldg Integrated Leak Rate Test & Periodic Local Leak Rate Tests ML20055D4031990-06-25025 June 1990 Proposed Tech Specs Re Changes in Safety Injection Tank Min Water Inventory ML20043E6231990-05-31031 May 1990 Proposed Tech Specs 3.10.3 & 3.10.4 Re Limiting Conditions for Operation ML20034B3071990-04-19019 April 1990 Proposed Tech Specs Re HPSI & LPSI Pump Surveillance Frequency ML20042E2211990-04-12012 April 1990 Proposed Tech Specs,Addressing Administrative Changes ML20006A4651990-01-18018 January 1990 Proposed Tech Specs Re HPSI Throttle & Pressurizer Auxiliary Spray Mods & Surveillance Requirements for ECCS ML20005F1431990-01-0505 January 1990 Proposed Tech Specs Re Instrumentation Sys ML19332D1161989-11-22022 November 1989 Proposed Tech Specs Incorporating Wording from Generic Ltr 84-13 Which Removes Table 3.7.4 Re safety-related Mechanical Snubbers ML20247L3581989-09-14014 September 1989 Proposed Tech Specs Re Limiting Condition for Operation & Surveillance Requirements for Control Rod Insertion Limits, Boron Control,Peak LHGR & Xenon Redistribution Multiplier ML20246M0541989-08-31031 August 1989 Proposed Tech Specs,Modifying Pages 3/4 3-19,Table 3.3-4 & 3/4 3-21,Table 4.3-3,to Add Steam Line Monitors & Primary Vent Stack Noble Gas Monitor to Listing of Radiation Monitoring Instrumentation & Surveillance Requirements ML20247M6321989-07-24024 July 1989 Proposed Tech Specs Re Power Distribution Limits ML20246M0221989-07-12012 July 1989 Proposed Tech Spec Tables 3.3-4, Radiation Monitoring Instrumentation & 4.3-3, Radiation Monitoring Instrumentation Surveillance Requirements ML20244D3841989-04-14014 April 1989 Proposed Tech Specs Re Steam Generator Pressure/Temp Limits, Primary Pump Seal Water Sys,Control Room Emergency Air Cleaning Sys & Sealed Source Contamination ML20244D3931989-04-11011 April 1989 Core 20 Startup Program for Yankee Nuclear Power Station ML20246P1401989-03-21021 March 1989 Proposed Tech Specs Adding Snubber DRH-SNB-1 to Table 3.7-4 ML20196B0771988-11-22022 November 1988 Tech Spec Page 3/4 3-2 Inadvertently Omitted from Util 881021 Proposed Change 222 to Tech Specs ML20205L1691988-10-21021 October 1988 Proposed Tech Specs,Removing Description of High Pressurizer Water Level & Modifying Description of Main Coolant Sys High Pressure ML20151Z1871988-08-11011 August 1988 Proposed Tech Spec Changes to Remove Ref to Specific Value of 2,200 Ppm & Provide Generalized Boron Concentration Value & Remove Requirement for Inverse Count Rate Multiplication Measurement After Insertion of Each Five Fuel Assemblies ML20150B0371988-06-27027 June 1988 Proposed Tech Specs,Allowing Installation of Two Piping Mods Necessary for Installation of Enhanced Water Cleanup Sys ML20196K7361988-06-27027 June 1988 Proposed Tech Spec Table 3.6.1, Containment Barriers, Deleting Valve VD-V-752 & Tech Spec 3.4.5.1, Main Coolant Leakage Detection Sys, Adding Operability,Action & Surveillance Requirements for Telltale Level Switch ML20196J2831988-06-27027 June 1988 Proposed Tech Specs 3.5.1.e,increasing Nitrogen Supply Pressure to Safety Injection Accumulator to 488 Pounds Per Square Inch Gauge ML20196K1391988-06-27027 June 1988 Proposed Tech Specs Table 3.6-1 ML20154J5991988-05-19019 May 1988 Proposed Tech Spec 4.9.7.2, Spent Fuel Pit ML20151D0671988-04-0404 April 1988 Proposed Tech Spec Page 3/4 8-10 Re Battery Chargers ML20148Q8911988-04-0404 April 1988 Proposed Tech Specs Defining Incore Detection Sys as Combination Sys of Both Fixed & Movable Detectors & Associated Equipment ML20148Q4681988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20148J2991988-03-25025 March 1988 Proposed Tech Spec Table 3.3-2, ESF Instrumentation & Table 4.3-2, ESF Instrumentation Surveillance Requirements, Reflecting Deleted Modes 5(1) & 5*, Respectively ML20150E2381988-03-25025 March 1988 Proposed Tech Specs Modifying Containment Isolation Barriers ML20148J2701988-03-23023 March 1988 Proposed Tech Spec 3.1.1.1.2,reflecting Change in Shutdown Margin Switching Temp from 490 to 470 F ML20150C0171988-03-11011 March 1988 Proposed Tech Specs Modifying Section 6.2 & Moving Organization Charts (Figures 6.2-1 & 6.2-2) to Section 501 of FSAR ML20154L9791988-03-0606 March 1988 Rev 6 to Yankee Nuclear Power Station Offsite Dose Calculation Manual ML20148K1671988-01-15015 January 1988 Proposed Tech Specs,Adding Shipping Cask Liners,Vol Reduction Equipment,Shipping Casks Not for Spent Fuel & Spent Fuel Assembly Nondestructive Test Equipment to Tech Spec 3.9.7 ML20149E8871988-01-0505 January 1988 Proposed Tech Specs,Modifying Tables 3.3-2,3.3-3 & 4.3-2 to Require 18-month Functional Test of First Level Undervoltage Protection for Each of Three 480-volt Emergency Buses ML20149E7271988-01-0505 January 1988 Proposed Tech Spec Figure 6.2.2, Facility Organization, Reflecting Elevated Mgt Concerns Re Security 1999-04-23
[Table view] Category:TEST REPORT
MONTHYEARML20058D8451990-10-29029 October 1990 Separate Rept Re Local Leak Rate Test Results from Core 19/20 Refueling Outage ML20058D8421990-06-30030 June 1990 June 1990 Reactor Containment Bldg Integrated Leak Rate Test & Periodic Local Leak Rate Tests ML20244D3931989-04-11011 April 1989 Core 20 Startup Program for Yankee Nuclear Power Station ML20235Q7771987-09-30030 September 1987 Core Xix Startup Program for Yankee Nuclear Power Station ML20237C7631987-06-30030 June 1987 Reactor Containment Bldg Integrated Leak Rate Test ML20237C7911987-05-31031 May 1987 Separate Accompanying Summary Rept of Type B & C Results.. ML20210C4631986-03-31031 March 1986 Core Xviii Startup Program for Yankee Nuclear Power Station ML20133P8441985-07-31031 July 1985 Rev 0 to Test Rept,Experimental Verification of Presray Reactor Cavity Liner Seal for Yankee Nuclear Power Station ML19350C1551981-03-20020 March 1981 Best Estimate Post-Test Prediction for Loft Nuclear Experiment L3-6 (RELAP5/Modl Predictions) ML19340E4881980-09-30030 September 1980 Separate Accompanying Summary Rept of Type B & C Events Since June 1977 Type a Test ML19209B7431979-10-0303 October 1979 Smoke Simulation Prototype Test Conducted at Yankee Rowe Nuclear Plant, Prepared for Bg&E,Comm Ed,Fl Power & Light Co,Northeast Utils Co & Yankee Atomic Electric Co ML20148H1581977-11-30030 November 1977 Core 13 Startup Rept ML19343B1131975-12-31031 December 1975 Core 12 Physics Test for Yankee Rowe ML20031C3141961-02-13013 February 1961 Operation Rept 1,Initial Startup & Test Operations of Yankee Reactor for Period 600709-610129 1990-06-30
[Table view] |
Text
4 O
SEPARATE ACCOMPANYING
SUMMARY
REPORT OF TYPE "B" AND "C" EVENTS SINCE THE JUNE 1977 TYPE "A" TEST SEPTEMBER 1980 YANKEE ATOMIC ELECTRIC COMPANY R0WE, MASSACHUSETTS 01346 1.
Prepared By:
%R
.bb co W n Reviewed By:
./
4 v 7/_ h Plant Refetor Engineer f
ggfg7,4
[ IdI'd Approved By:
Plant Beperinterident I
810114 0 W4.
+
g-n-
y-.
v
Page 1 In the interval between the June 1977 Type "A" test and the September 1980 Type "A" test, all Type "B" and "C" vapor container penetration barriers subject to testing under Appendix J to 10 CFR 50 were tested at accident pressure on a two year basis (vapor container personnel hatch on a six month basis).
During that time, eight Type "C" failures occurred.
In addition, two Type "C" test periods exceeded the 24-month maximum allowed.
All ten evsnts were reported at the time and are summarized in Table 1.
Copies of the Licensee Event Reports are also attached.
There were no events concerning Type "B" tests during the interval.
6 l
,---c v
y
~
TABLE 1
~
TYPE "C" TEST EVENTS, JUNE 1977 to SEPTEMBER 1980 LER #
SYSTEli BARRIER DISPOSITION 77-44 VC Pressure Sensing / Service Water TV-211/TV-408 TV-211: Underwent seat and disc machining TV-408: Diaphragm replaced 78-010 Post Accident flydrogen Vent IIV-SOV-1 Cleaned internals; replaced rubber seal
.78-034 Neutron Shield Tank Sample TV-207 Cycled under pressure 79-05 Service Water TV-408 Valve seat cleaned 79-14 Post Accident liydrogen Vent CA-V-688 Cleaned internals 79-27 Post Accident !!ydrogen Vent IIV-SOV-1 & 2 Cleaned internals 79-29 Post Accident !!ydrogen Vent IIV-SOV-1 & 2 Cleaned internals 80-13 Steam Generator Blowdown TV-401D Foreign material removed 78-09 Post Accident flydrogen Vent llV-SOV-1 & 2 Missed surveillance rerformed 79-20 Main Coolant Drain VD-TV-202 Missed surveillance performed 9