ML19340E478

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,First Reported on 801208,re Inability to Verify Certain Pipe Sleeve Installation from Const Records.Investigation to Be Augmented by Onsite Insp & Engineering Evaluation.Final Rept to Be Filed by 810601
ML19340E478
Person / Time
Site: Marble Hill
Issue date: 01/07/1981
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8101140645
Download: ML19340E478 (2)


Text

.

2 . . , 0107814008 "J1 1' .

PUBLIC SERVICE  :

.I N D I A N A __

S. W. Shields ,--

T-Senior Vice Presdent - [',

Nuclear Division January 7, 1981 2

Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 Region III '

Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hiil Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On December 8,1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable

( item as required by 10 CFR 50.55(e). During receipt inspection, PSI l

Quality Assurance personnel were unable to verify using construction records that certain pipe sleeves had been installed in their designated l locations. This concern pertained to a group of piping subassembly and partial component support sleeves which were both safety and non-safety related and of various materials.

PSI is conducting further investigation of available construction records in an effort to establish the traceability of the sleeves in question.

This investigation will be augmented as necessary by on-site inspection of installed sleeves and an engineering evaluation to determine their acceptability.

l This letter is intended to fulfill the requirements of an interim report as defined in 10 CFR 50.55(e) . PSI will complete its investigation of this matter and file a final report on or before June 1,1981.

got1 l 810114 0 v45 6'8 5

P.O. Box 190, New Washington, Indiana 47162 812. 293.4441

.- . ... 4 s. . . . .

4 B

/~1,f

~/

PUBUC SERVICE i INOMNA Letter: James G. Keppler January 7, 1981 i

1

! If you have any questions on this matter, please feel free to contact me.

Sincerel i.

S. W. Shields  !

i TDG/SWS/mj g

cc
Director of Inspection and Enforcement 's i U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibinz, P. E.

! J. J. Harrison e

6 i

l i

I l

O l'

i .

f

, ,, , _ - . . . ,.asm l

f-- , ~ .,-,- - , - . , - , , , , - - , . , - - , - , - . . . , , - , - ,, -,,, ,,,,,-,-.-c... ,--,,,-. --- - -,- _ -,-,.c -.,,.-.,,,--..c~.-,.,,. , , - . , . -