First Interim Deficiency Rept,Originally Reported on 801203, Re Discrepancy in as-built Vs as-analyzed Piping Anchor Location.Tva Analyzing Discrepancy to Determine Hardware Changes Necessary.Next Rept to Be Filed by 810220
ML19340E475
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/05/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, SQRD-50-328-81, NUDOCS 8101140636
Download: ML19340E475 (2)


Text

,.

-e _j r ; ,_5 400 Chestnut Street Tower II January 5, 1981 '.

SQRD-50-328/81-01

._ =

N H Mr. James O'Reilly, Director

Z, "

Office of I ection and Enforcement U.S. Nuclear Re latory Consnission Region II - Suite 100 101 Marietta Street Atlanta, Georgia 303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - DESCREPANCY IN AS-BUILT VERSUS AS-ANALYZED PIPING ANCHOR LOCATION - SQRD-50-328/81 FIRST INTERIM REPORT The subject deficiency ins initially reported to HRC-0IE Inspector R. W. Wright en December 3, 1980, in accordance with 10 CFR 50.55(e) as NCR SQN GB 8037. Enclosed is our first interim report. We expect to submit our next report by February 20, 1981.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure -

cc: Mr.VictorStello,Jr., Director (Enclosuie)[

Office of Inspection and Enforcement U.S. Nuclear Regulatory Constission Washington, DC 20555

$l$

$1/

8101140634 S. .. . _ . . __ - . .

ENCIDSURE SEQUOYAH NUCLEAR PLANP UNIT 2 DISCREPAtCY IN AS-BUILT VERSUS AS-ANALYZED PIPING ANCHOR IDCATIOT SORD-50-328/81-01 10CFR50.55(e) REPORP FIRST INTERIM REPOic Description of Deficiency During a review of a suggrt modification request, it was discovered that design drawings of an anchor in the ocxnponent cooling water system did not agree with the as-analyzed anchor location. 'Ibe as-analyzed location of the anchor is at elevation 705'-6" on a run of pipe 45 0 with the vertical. 'The' as-built location is at elevation 707'-6" on a horizontal run of pipe. -

Corrective Action TVA is performing an analysis of the subject piping to determine if any hardware changes will be required.