ML19340E341

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-295/80-20 & 50-304/80-21 on 801001-1114.No Noncompliance Noted
ML19340E341
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/28/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19340E342 List:
References
NUDOCS 8101140091
Download: ML19340E341 (2)


See also: IR 05000295/1980020

Text

ff U

  1. ps Meg'o

n

UNITED STATES

!"

3,

NUCLEAR REGULATORY COMMISSION

"

g

'

g

~c

REGION lil

M

m

o,,

f

799 ROOSEVELT ROAD

U

$

...../

GLEN ELLYN, ILLINots 60137

%

f;@

m

a.a

N3V 2 E $60

. cs

RS

,

Gs

c5

~

-

e,

e

m

Docket No. 50-295

A

'g

.

3

Docket No. 50-304

"'

o

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Kohler, J. R. Waters

and F. W. Reimann of this office on October 1 through November 14, 1980,

of activities at Zion Nuclear Power Station authorized by NRC Operating

License Nos. DPR-39 and DPR-48 and to the discussion of our findings with

Mr. K. L. Graesser at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection.

Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty ' days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which-the information is considered

proprietary, and should be prepared so that proprietary info'rmation

identified in the appliegion is contained in an enclosure to the application.

31.01yf Ok

-

-- - --

--

- - - -

. --

.

Commonwealth Edison Company

-2-

  • ' T .. A

,.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e

t bert F. Heishman, Chief

R actor Operations and Nuclear

support Branch

Enclosure:

IE Inspection Reports

No. 50-295/80-20 and

No. 50-304/80-21

cc w/encls:

Mr. J. S. Abel, Director

of Nuclear Licensing

Mr. K. G.aesser, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

AE0D

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

,