Text

.

ansu

/

'o UNITED STATES

! " 3,, ^,7, NUCLEAR REGULATORY COMMISSION

{

REGION 111 I

790 ROOSEVELT ROAD o

  • \\/

E GLEN ELLYN ILLINOls 6o137 o

November 14, 1980 Those on Attached Address Listing:

Enclosed is IE Bulletin No. 80-23 which requires action by you with regard to your nuclear power facility.

In order to assist the NRC in evaluating the value/ impact of each bulletin on licensees, it would be helpful if you would provide us an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of l

problems through the bulletin.

Should you-have any questions regarding this bulletin or the actions re-(

quired by you, please contact this office.

Sincerely,

[

Q _g_h fe^^

hmesG.Keppleh Director

Enclosure:

IE Bulletin No. 80-23 cc w/ enc 1:

Mr. D. W. Kane, Sargent & Lundy Mr. Gary N. Wright, Chief l

Division of Nuclear Safety Reproduction Unit NRC 20b

.~

RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's and PWR's)

Docket No. 50-341 The Detroit Edison Company ATTN:

Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 13 2000 Second Avenue 73 Detroit, MI 48-226

.a C:

Iid cc w/ enc 1:

L c; 7

cII Central Files Director, NRR/DPM

!!j Director, NRR/ DOR

'M

-2 E

AEOD bl ex' Resident Inspector, RIII PDR Local PDR NSIC TIC i

Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,

Attorney l

Docket No. 50-461 Docket No. 50-462 Illinois Power Company I

ATTN:

Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 ce nel:

tral Files Director, NRR/DPM Director, NRR/ DOR PDR

(

Local PDR l

NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General l

Mr. Gary N. Wright, Chief Division of Nuclear Safety l

l l

7


yaw r-

---re

~

e-wr

-y e-.w r

-w--

.w

SSINS No.:

6820 Accession No.:

8008220257 IEB 80-23 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555

~~

November 14, 1980 IE_ Bulletin No. 80-23:

FAILURES OF SOLEN 0ID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION

==

Introduction:==

Valccr Engineering Corporation (Valcor) has submitted 10 CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.

These failures have occurred at nuclear facilities owned by Duke Power Company and Omaha Public Power District, and are purportedly limited to solenoid valves having part numbers (P/N's) V70900-21-1 and V70900-21-3.

The information presented in this bulletin is intended to shed light on the defective solenoid valves so that appropriate actions can be taken to circum-vent the degradation of any safety-related system using such solenoid valves.

DISCUSSION:

The specific Valcor solenoid valves addressed herein were purportedly designed as Class IE components.

However, in light of the reported failures, it appears that neither the design nor the qualification tests were adequate for Class IE service.

Valcor has attributed the failures to a latent defect in the magnet wire.

Valcor believes that this defect manifests itself when the solenoid valves are continuously energized at elevated temperatures by an incompata-bility between the magnet wire's polyvinyl varnish coating and the wire's polyimide insulation which causes a dielectric breakdown leading to turn-to-turn shorts within the coil.

Valcor states that the above incompatability is limited to solenoid valves having P/N's V70900-21-1 and V70900-21-3, and that all customers affected by the aforementioned defect have been notified.

A listing of Valcor customers so notified and valves purchased follows.

CUSTOMER P.O. NO.

VALVE P/N QTY Anchor-Darling P-827 V70900-21-1,-3 24 Anchor-Darling N663 V70900-21-1 6

Cesare Bonetti (Italy) 1535/79 V70900-21-3 10 Duke Power Company E95188-11 V70900-21-3 100 Duke (Mill Power)

C-97733 V70900-21-1,-3 335 Duke Power Company E97822-11 V70900-21-3 70 Ralph Hiller HA-18 Mill Power E5246:

Omaha Public Power Dist.

43472 DUPLICATE DOCUMENT Stone and Webster L000 i Copes Vulcan 911,5!

Entire document previously entered into system under:

%butO W' ANO No. of pages:

\\

.