Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Written Response Required
ML19340E144
Person / Time
Site: Zimmer
Issue date: 11/14/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
References
NUDOCS 8101060497
Download: ML19340E144 (2)


Text

.

p> te coq'o, UNITED STATES

~ 7, NUCLEAR REGULATORY COMMISSION E

REGION 111 o

799 ROOSEVELT ROAD e

GLEN ELLYN,ILLINOls 60137 November 14, 1980 Those on Attached Address Listing:

Enclosed is IE Bulletin No. 80-23 which requires action by you with regard to your nuclear power facility.

In order to assist the NRC in evaluating the value/ impact of each bulletin on licensees, it would be helpful if you would provide us an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the bulletin.

Should you have any questions regarding this bulletin or the actions.re-quired by you, please contact this office.

Sincerely, kw&& A-1

[amesG.Keppieh Director

Enclosure:

IE Bulletin No. 80-23 cc w/ encl:

Mr. D. W. Kane, Sargent & Lundy Mr. Gary N. Wright, Chief Division of Nuclear Safety l

Reproduction Unit NRC 20b 0101060 hQ

RIII's CORPORATE ADDRESSES FOR OPERATING LICENSEES AND CONSTRUCTION PERMIT HOLDERS (BWR's and PWR's)

Docket Nos. 50-10, 50-237, 50-249; 50-254, 50-265; 50-295, 50-304; 50-373, E3 50-374; 50-454, 50-455; 50-456 and 50-457 c3

=

,2

)
~

Commonwealth Edison Company 24 ATTN:

Mr. Cordell Reed, h'

Vice President Da Post Office Box 767

.-U

~'

Chicago, IL 60690 xirj

~

'N r2 cc w/ enc 1:

U u

Mr. J. S. Able, Director Mr. Gunner Sorensen, Site of Nuclear Licensing Project Superintendent Mr. D. J. Scott, Station Mr. R. Cosaro, Project Superintendent Superintendent Mr. N. Kalivianakis, Mr. J. F. Gudac, Station Station Superintendent Superintendent Mr. K. Graesser, Station Central Files Superintendent Director, NRR/DPM Mr. L. J. Burke, Site Director, NRR/ DOR Construction Superintendent AEOD Mr. T. E. Quaka, Quality Resident Inspectors, RIII Assurance Supervisor PDR Mr. R. H. Holyoak, Station Local PDR Superintendent NSIC Mr. B. B. Stephenson, TIC Project Manager Mr. Dean Hansell, Of fice of Mr. V. I. Schlosser, Assistant Attorney General Project Manager Myron M. Cherry, Chicago Mr. R. E. Querio, Station Superintendent Docket No. 50-358 Cincinnati Gas and Electric Company ATTN:

Mr. Earl A. Borgmann Senior Vice President Engineering Services and Electric Production 139 East 4th Street Cincinnati, OH 45201 cc w/ enc 1:

Mr.

R. Schott, Plant Local PDR erintendent NSIC ral Files TIC Director, NRR/DPM Harold W. Kohn, Power Director, NRR/ DOR Siting Commission AEOD Citizens Against a Radioactive Resident Inspector, RIII Environment PDR Helen W. Evans, State of Ohio

SSINS No.-

6820 Accession No.

8008220257 IEB 80-23 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 November 14, 1980 IE_ Bulletin No. 80-23:

FAILURES OF SOLEN 0ID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION

==

Introduction:==

Valcor Engineering Corporation (Valcor) has submitted 10 CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.

These failures have occurred at nuclear facilities owned by Duke Power Company and Omaha Public Power District, and are purportedly limited to solenoid valves having part numbers (P/N's) V70900-21-1 and V70900-21-3.

The information presented in this bulletin is intended to shed light on the defective solenoid valves so that appropriate actions can be taken to circum-vent the degradation of any safety-related system using such solenoid valves.

DISCUSSION:

The specific Valcor solenoid valves addrest d herein were purportedly designed as Class IE components.

However, in 'iight of the reported failures, it appears that neither the design nor the qualification tests were adequate for Class IE service.

Valcor has attributed the failures to a latent defect in the magnet wire.

Valcor believes that this defect manifests itself when the solenoid valves are continuously energized at elevated temperatures by an incompata-bility between the magnet wire's polyvinyl varnish coating and the wire's polyimide insulation which causes a dielectric breakdown leading to turn-to-turn shorts within the coil.

Valcor states that the above incompatability is limited to solenoid valves having P/N's V70900-21-1 and V70900-21-3, and that all customers affected by l

the aforementioned defect have been notified.

A listing of Valcor customers so notified and valves purchased follows.

i CUSTOMER P.O. NO.

VALVE P/N QTY Anchor-Darling P-827 V70900-21-1,-3 24 Anchor-Darling N663 V70900-21-1 6

Cesare Bonetti (Italy) 1535/79 V70900-21-3 10 Duke Power Company E95188-11 V70900-21-3 100 l

Duke (Mill Power)

C-97733 V70900-21-1,-3 335 Duke Power Company E97822-11 V70900-21-3 70 Ralph Hiller HA-18 Mill Power E5246:

Omaha Public Power Dist.

43472 DUPLICATE DOCUMENT Stone and Webster L000 i l

Copes Vulcan 911,5!

Entire document previously entered into system under:

t

% 6 %E O W' ANO

(

No. of pages:

-,w.-

y

.-,