ML19340E139

From kanterella
Jump to navigation Jump to search
Forwards Suppl 1 to IE Info Notice 80-29, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required
ML19340E139
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/26/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8101060490
Download: ML19340E139 (1)


Text

CENTRAL FILES

[f'" %,

UNITED STATES PDR:HQ NUCLEAR REGULATORY COMMISSION

$,,,,, 3 t

}

REGloN IV NS[C k

'['[

611 RY AN PLAZA DRIVE. SUITE 1000 ARLINGTON, TEXAS 76011 STATE Novemoer 26, 1980 Jocket Nos.

50-313 50-368 Arkansas Power and Light Company ATTN:

Mr. William Cavanaugh III Vice President of Generation and Construction P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

This IE Information Notice is provided as an early notification of a possible significant matter.

It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requested at thh time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely,

,dt((

Karl V. Seyfrit [/

i Oirector 1

i

Enclosures:

1.

IE Infomation Notice No. 80-29 Supplement No.1 2.

List of Recently Issued IE Information Notices cc:

James P. O'Hanlon, Plant Manager l

Arkansas Nuclear One P. O. Box 608 l

Russellville, Arkansas 72801 6101060 0

1 SSINS No.:

6835 l

Accession No.:

8006190028 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 IE Information Notice No. 80-29 Supplemental No. 1 Date:

November 26, 1980 Page 1 of 1 BROKEN STUDS ON TERRY TURBINE STEAM INLET FLANGE Description of Circumstances:

In the original Information Notice the failed Terry Turbine steam inlet flange studs were identified as probably manufactured from ASTM-A193-Grade 87 steel.

Subsequently, the vendor has informed the NRC that the bolting material used at ANO-1 was AISI C-1117 steel.

Independent laboratory analyses by the NRC and Arkansas Power and Light have verified that the bolting material was a re-sulphurized, re phosphorized cold drawn carbon steel.

4 From the analysis performed, the failure was caused by high overload which resulted in a primarily brittle transgranular fracture (cleavage) in probably less than 10 cycles.

This is consistent with the operating experience (water slugging) and the inherent low toughness of the bolting material used.

Licensees are encouraged to review the materials selected for safety-related bolting applications considering especially those situations where impact loadings could occur.

The use of low toughness carbon steel (re-sulphurized free machining plain carbon steel) for bolting is discouraged by the NRC; particularly in situations where possible high loading conditions could be anticipated.

This Information Notice is provided as an early notification of a possibly significant matter that is still under review by the NRC staff.

It is expected that recipients will review the information for possible applicability to their facility.

No specific action or response is requested at this time.

If you have any questions regarding this matter, please contact the Lirector of the appropriate NRC Regional Office.

- _ = -

' IE Information Notice No. 80-29

^

Supplemental No. 1 November 26, 1980 LISTING 0F RECENTLY ISSUED IE INFORMATION NOTICES l

Information Subject Date Issued To Notice No.

Issued 80-37 Containment Cooler Leaks 10/24/80 All nuclear power and Reactor Cavity facilities holding Flooding at Indian Point power reactor Operating Unit 2 Licenses (0Ls) or Construction Permits (cps)

)

80-38 Cracking in Charging 10/30/80 All Pressurized Water Pump Casing Cladding Reactor Facilities

~

holding power reactor Operating Licenses (OLs) and Construction Permits (cps) 80-39 Malfunctions Of Solenoid 10/31/80 All light water reactor Valves Manufactured By facilities holding Valcor Engineering Corporation power reactor Operating Licenses (OLs) or Construc-tion Permits (cps) 80-40 Excessive Nitrogen 11/7/80 All power facilities Supply Pressure with an Operating License Actuates Safety-Relief (OL) or Construction Valve Operation to Permit (CP)

Cause Reactor Depressuriza-tion i

80-41 Failure of Swing Check 11/10/80 All power reactor Valve in the Decay Heat facilities with an Operating Removal System at David-License (OL) or Construction Besse Unit No. 1 Permit (CP) 80-42 Effect of Radiation 11/24/80 All power reactor on Hydraulic Snubber Fluid facilities with an Operating License (0L) or Construction Permit (CP)