Forwards IE Investigation Rept 50-341/80-13 on 800728-31.No Noncompliance Noted
ML19340D636
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/21/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19340D637 List:
References
NUDOCS 8012310514
Download: ML19340D636 (2)


See also: IR 05000341/1980013

Text

-

pa troo

'o

UNITED STATES

"g

g

NUCLEAR REGULATORY COMMISSION

h

[")",

'*

g

e

REGION 111

o,

799 nooSEVELT ROAD

>

  • \\/

GLEN ELLYN. ILLINOIS 60137

o

-

ocr -; , ,,

.

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

This refers to the investigation conducted by Messrs. J. E. Foster and

K. D. Ward of this office on July 28-31, 1980, of activities at the

Enrico Fermi 2 Nuclear Power Plant authorized by NRC Construction Permit

No. CPPR-87 and to the discussion of our findings with you and others at

the conclusion of the investigation. This investigation was conducted

to determine the substance of allegations that piping and structural steel

welding quality control was deficient, and identified nonconformances were

being improperly dispo.;itioned.

The enclosed copy of our investigation report identifies the areas examined

during this investigation. Within these areas, the investigation consisted

of a selective examination of records and procedures, observations of

components and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this investigation.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

i

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is

I

considered proprietary, and should be prepared so that proprietary in-

formation identified in the application is contained in an enclosure to

the application.

!

dd

_

.

-

.

-

..

.

OCT '21 880

Detroit Edison Company

-2_

.

We will gladly discuss any questions you have concerning this

inspection.

~

Sincerely,

N'

James G. Keppler

Director

Enclosure:

IE Investigation

Report No. 50-341/80-13

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC '

Ronald Callen, Michigan

Public Service Commission

Eugene B. Thomas, Jr.,

Attorney

,