Proposed Corrections to Jd Kane 801015-16 Deposition. Certificate of Svc Encl
ML19340D113
Person / Time
Site: Midland
Issue date: 12/05/1980
From: Paton W
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To:
Atomic Safety and Licensing Board Panel
References
ISSUANCES-OL, ISSUANCES-OM, NUDOCS 8012290104
Download: ML19340D113 (11)


Text

C',

@f

@i 19 a',h.

a 3

13 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 12/5/80 9

5 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

+

In the Matter of

)

)

CONSUi!ERS POWER COMPANY

)

Docket Nos. 50-329-0M

)

50-330-0M (Midland Plant, Units 1 and 2)

)

In the Matter of

)

)

CONSUMERS POWER COMPANY

)

Docket Nos. 50-329-0L

)

.50-330-OL (Midland Plant, Units 1 and 2)

)

PROPOSED TRANSCRIPT CORRECTIONS The NRC Staff hereby submits the following proposed transcript corrections to the Deposition of Joseph D. Kane, taken on October 14, 15 and 16, 1980 in Detroit, Michigan.

Date Page Line Change 10/14/80 7

12 John Greves to John Greeves and Dennis Gupta to Denish Gupta 7

13

"...there are two too, on board as" to "...there are two, two or. board as".

9 12

" structures but" to " structures that".

11 2

"to guide by" to "to guides by".

11 3

"liquification" to "liquefacation.".

12

'13

" Reg. Guide 170, Section 25" to " Reg. Guide 1.70, r

l Section 2.5".

l l

12 25

" Reg. Guide.170, Section 25" to " Reg. Guide 1.70, Section 2.5".

l 19 18

" staff for its consultants," to " staff or its consul tants,".

i 8 012290 lOy.

Date Page Line Change 10/14/80 24 18 "the plant fill did we in fact obtained the" to "the plant fill, did we in fact obtain the".

32 13 "would be with that berm that" to "would be where that berm that".

36 18

" hydrologic fracturing" to " hydraulic fracturing".

36 23 "Bectol" to "Bechtel".

36 25 "Bectol" to "Bechtel".

37 14 "that you have performed borings" to "that you have, performed borings".

38 11

" hydrologic fracturing" to " hydraulic -

fracturing".

38 14

" hydrologic fracturing" to " hydraulic f racturing".

'38 16

" hydrologic fracturing" to " hydraulic fracturing".

44 10

" waste that which have been dredged" to

" waste which had been dredged".

53 15

" records" to " reports".

55 3

"It would occur".to "It could occur".

58 25

" portions may not be, in that document" to -

" portions may not be.

In that document".

62 62

" prior to them" to " prior to then".

70 4

" engineer review had in his branch questioned" to " engineer reviewer had in his branch and questioned".

73 22

" pointed out to me that the SER stage" to

" pointed out to me that at the SER stage".

75 3

"I am not talking" to "I am now talking".

75 5

" documents geestions were" to '! documents,

~

questions were".

Date Page Line Change i

i 10/14/80 89

!4 "let's made Midland Q" to "let's make j

Midland Q".

89 15

" build" to "buil t".

90 6

" attempting to is to assure" to " attempting to do is to assure".

91 5

" Chief of Hydrologic Engineering" to

" Chief of Hydrologic and Geotechnical i

Engineering".

1 93 9

" building" to " embankment".

)

100 21

" September 4th" to " September 14th".

j 104 23 "and I correct?" to "am I correct?".

106 9

"try and bide by" to "try and abide by".

l 106 10

" understanding of a deposition is" to

" understanding of what a deposition is".

i 114 24 "while" to "what".

i 132 7

" understand" to " understanding".

134 3

" load be able to look at what the Corps has-requested and" to " load to be able to look -

4 at what the Corps had requested and".

139 3

"ti tle" to " pipe".

141 22 "A" to "Q".

I 141 23 "Q" to "A".

148 8

"no involvement ~between October and November I think the" to "no involvement. Between October and November, I thinkf the".

148 15

" Leo Geary" to "Neil Gehring".

r 149 24

" plan four" to " plant fill".

l 152 6

"again" to "begin".

1 54 11 "other" to "others".

l l

...u.--

4-I Date Page Line Change 10/15/80 4

21

" sections 37 and 38" to " sections 3.7 and 3.8".

4 23 "Section 37" to "Section.

7".

3 I

4 24

" Portions of 38 and 38" to " Portions of 3.7 and 3.8".

5 8

" effective ground water influences are" to "effect of ground water infulences our".

5 18 "liquidification" to " liquefaction".

5 21 "bouancy" to " buoyancy".

6 13 Period needed at the end of the line.

6 14 "but this" to "But this".

6 16

" develop off of seepage -developed it" to

" develop off of pond seepage could saturate'.

8 8

" steady seepage of that level" to " steady seepage from that level".

11 4

" expect upon recovery. the level" to " expect, upon recovery, the level".

11 5

" recovered would have" to " recovered to would j

have".

17 9

" Casa Grande" to "Casagrande".

17 10

" Casa Grande" to "Casagrande".

17 12

" Casa Grande" to "Casagrande".

l 22 15

" saturating" to " saturated".

32 14

" General Gallagher" to' " Gene Gallagher".

l 46 20

" platted" to " plotted".

t 52 12 "what time as of June,1980." to "what time, j

as of June,1980?"

64 24

" drainage" to " density".

_ ~.. -. -.,. - -,,.. - _ _... _..,..

.,_s..__.._

d I

~

5-Date Page Line Change 10/15/80 69 25 "Davison" to "Davisson".

70 3

"Davison" to "Davisson".

70 5

"Davison" to "Davisson".

70 6

"Davison" to "Davisson".

70 11 "Davison" to "Davisson".

i 70 15 "Davison" to "Davisson".

71 3

- "Hadula" to "Hadala".

71 4

"Hadula" to "Hadala".

71 5

"Hadula" to "Hadala".

71 6

"Hadula" to "Hadala".

71 8

" Maryland" to " Mississippi".

71 13

- "Hadula" to "Hadala".

1' 71 18 "Hadula"' to "Hadala" and "Davison" to "Davisson".

72 2

"Davison" to "Davisson".

72 15

' "Davison" to "Davisson".

J 73 3

"Davison" to "Davisson".

74 21 "resul ting"- to "resulted".

76 22

" reorientation" to " reorganization".

77 2

" Leer" to " Lear".

77 5

" Leer" to " Lear".

77 19

" Leer" to " Lear".

]

77 24

" Leer" to " Lear".

78 10

" Leer" to " Lear".

I 78 11

" Leer" to " Lear".

j 79 11

" apprise" to " appraise".

86 3

" approach to trying" to " approach of trying".

87 6

" Leer" to " Lear".

.,-ym

,,,m-

--,,.,.w m,,

.-e-wmy.,..,y v.

,.._,,n,m,.,--,,,,,,,,,..,,..,,g,,,,,,,.,e

,,.,,g.m_m,m..,,ps,,

.,, -,, -.,,,, e r,.. a..

m.,,n

.w,,,,-.

j. -

Date Page Line Change 10/15/80 97 20

'!SER or the OL" to "SER for the OL".

125 12 "ASE" to "ASCE".

125 16 "ASE" to "ASCE".

126 2

"ASE" to "ASCE".

[

127 15

" drainage" to " regime".

l 129 5

" position" to " portion".

133 16 "is being carried by the material." to "was being carried by the sand material."

139 17

" charge" to " surcharge".

140 12

" apprise" to " appraise".

l 143 2

" condensing" to " condensation".

i 148 10 "SCE" to."ASCE".

148 13 "SCE" to "ASCE".

t f

170 3

"think" to " thin".

i 4

188 7

"in-situ'the extent" to "in-situ stresses and the extent".

4 189 24 "done of the glacial" to "done on the glacial".

193 14 "keps".to " kips".

193 15 "keps" to " kips".

193 18 "keps" to " kips".

193 19 "keps" to " kips".

-[

193 22 "keps" to kips".

194 6

"keps" to " kips".

194 11 "keps" to " kips".

195 20 "keps" to " kips".

l 195.

21 "keps" to " kips".

196 3

"keps" to " kips".

196 12 "keps" to " kips".

l 1

. Date Page Line Change 10/15/80 196 21 "keps" to " kips".

197 2

"keps" to " kips".

197 15 "taken" to "taking it".

197 22 "Bousines" to "Boussinesq".

197 23 "B-o-u-s-i-n-e-s," to "B-o-u-s-s-i-n-e-s -q, ".

197 24 "Bousines" to "Boussinesq".

207 17 "keps" to " kips".

207 19 "different" to " difference".

10/16/B0 4

23 "of built." to "or built."

5 3

"I saying" to "I am saying".

8 23 "A"

to "Q".

12 22 "Kapushke" to "Cappucci".

13 5

" Sower" to "Schauer".

13 6

"Ranaldi" to "Rinaldi".

13 8

"Volmer" to "Vollmer".

13 20

" Haugh" to " Hough".

l 13 21

" Haugh" to " Hough".

t 13 22

'"H-a-u-g-h" to "H-o-u-g-h".

l 15 7

" compressed wall layer" to " compressible layer".

l 17 23 "Bectol" to "Bechtel".

18 10 "Bectol" to "Bechtel".

18 19

" indicate" to " indicated".

27 3

"Bectol" to "Bechtel".

l 31 13 "why tire piezometric" to "why the piezometric".

32 8

" draw off sections" to " draw cross sections".

i 50 22 "keps" to " kips".

51 6

"keps" to " kips".

l l

[

j. !

r.

Date Page Line Change i

10/16/80 51 7

"keps" to " kips".

51 11 "keps" to " kips".

52 S

"keps" to " kips".

55 2

"Bectol" to "Bechtel".

56 5

"Bectol" to "Bechtel".

56 16 "Bectol" to "Bechtel".

56 18 "Bectol" to "Bechtel".

56 20 "Bectol" to "Bechtel".

l-68 2

"importance" to "important".

72 7

" establish" to " established".

83 10

" discussed the but contents" to " discussed but the contents"'

t 87 14 "WES and dynamic" to "WES on dynamic".

87 15 "liquifaction" to " liquefaction".

i 88 8

" engineering dynamic analysis" to " engineering and dynamic analysis" and "liquifaction" to-

" liquefaction".

88 10 "Bectol" to "Bechtel".

i 88 18 "Hadula" to "Hadala".

88 22 "Hadula" to "Hadala".

88 23 "Bectol" to "Bechtel".

4 89 12 "Hadula" to "Hadala" and "Bectol" to "Bechtel".

89 13 "Bectol" to "Bechtel".

89 14 "Hadula" to "Hadala". and "Bectol" to "Bechtel".

89 15 "Hadula" to "Hadala".

t 89 17 "Davison" to "Davisson".

89 23 "Hadula" to "Hadala".

90 23 "liquifaction" to " liquefaction".

y

. _... _... _.. _.,. _. _.. _,. ~. _. _,, ~..,..

. Date Page Line Change 10/16/80 92 2

"Hadula" to "Hadala".

92 6

"Hadula" to "Hadala".

Respectfully submitted, fi M

William D. Paton Counsel for NRC Staff Dated at Bethesda, Maryland this 5th day of December, 1980.

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of CONSUMERS POWER COMPANY

)

Docket Nos. 50-329-0M & OL

)

50-330-0M & OL (Midland Plant, Units 1 and 2)

)

CERTIFICATE OF SERVICE 4

i I hereby certify that copies of " PROPOSED TRANSCRIPT CORRECTIONS" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class, or as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 5th day of December, 1980:

  • Charles Bechhoefer, Esq.

Ms. Mary Sinclair Atomic Safety and Licensing Board 5711 Summerset Street U. S. Nuclear Regulatory Commission Midland, Michigan 48640 Wachington, D.C.

20555

  • Mr. Gustave A. Linenberger Michael I. Miller, Esq.

Atomic Safety and Licensing Board Ronald G. Zamarin, Esq.

U. S. Nuclear Regulatory Commission Alan S. Farnell, Esq.

Washington, D.C.

20555 Isham, Lincoln & Beale-One First National Plaza Dr. Frederick P. Cowan 42nd Floor 6152 N. Verde Trail Chicago, Illinois 60603 Art. B-125 Boca Raton, Florida 33433

  • Atomic Safety and Licensing-Board Panel Frank J. Kelley U. S. Nuclear Regulatory Commission Attorney General of the State Washington, D.C.

20555 of Michigan l

Steward H. Freeman

-

  • Atomic Safety and Licensing Assistant Attorney General Appeal Board Panel Gregory T. Taylor U. S. Nuclear Regulatory Commission Assistant Attorney General Washington, D.C.

20555 Environmental Protection Division 720 Law Building

  • Docketing and Service Section Lansing, Michigan 48913 Office of the Secretary i

U. S. Nuclear Regulatory Commission Myron M. Cherry, Esq.

Washington, D.C.

20555 1 IBM Plaza Chicago, Illinois 60611

-r

,-y.

,m,-

gi-

-.c w

--6e

-+-p-we e-r 1

-=7 tv v

- - =m-t--

- - - - -+'

" ear-eor v,a w --

+.

- i*

James E. Brunner, Esq.

Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Ms. Barbara Stamiris 5795 N. River l

Freeland, Michigan 48623 L

Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 Wendell H. Marshall, Vice President 4

I Midwest Environmental Protection Associates RFD 10 Midland, Michigan 48640 Ms. Sharon K. Warren 636 Hillcrest Midland, Michigan 48640

.4 (Z

William D. Paton Counsel for NRC Staff-1 I

r