ML19340C854

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Is Required
ML19340C854
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/31/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8012170818
Download: ML19340C854 (1)


Text

T T t D*

'm; UNITED STATES J.

NUCLEAR REGULATORi' COMMISSICN 5

REGION IV

= x A['f s

(

611 RYAN PLAZA DRIVE. SUITE 1000 m

ARLINGTON. TEX As 76011 October 31, 1980 y

b In Reply Refer To:

7?

];;,

RIV rh >

Docket No. 50-382/IE Information Notice No. 80-39 hku l[h.

W-SMlr E

xx u+v 1

%?i cc m

. Louisiana Power and Light C:,,

iM EIS EO ATTN:

Mr. D. L. Aswell Vice President of Power Production 142 Delarende Street New Orleans, Louisiana 70174 Gentlemen:

The enclosed IE Infor=ation Notice provides early notification of an event that

=ay have safety significance.

Accordingly, you should review the Information Notice for possible applicability to your facility.

No specific action or response is requested at this time; however, contingent upon the results of further staff evaluation, a Bulletin or Circular recom-mending or requesting specific licensee actions may be issued.

If you have questions regarding this matter, please contact me.

Sincerely, l --(/-

-y a

\\

s fC,

- } ! '-

Karl V. Seyfrit Director Enr asures:

1.

IE Information Notice No. 80-39 2.

List of Recently issued IE Information Notices 8012170 Tl8

SSINS No..

6835 Accession No.-

8008220245 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 IE Information Notice No. 80-39 Date: October 31, 1980 Page 1 of 1 MALFUNCTION OF SOLEN 0ID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION PLTPOSE:

The intent of this Information Notice is to alert holders of construction permits and operating licenses for nuclear power plants of a potentially generic problem involving the malfunctioning of certain solenoid valves manu-factured by the Valcor Engineering Corporation (Valcor).

The solenoid valves so involved are designated as Valcor Valve Model No. V52600-554-1.

Valcor has informed us that these valves have only been supplied to the McGuire facility; however, since these valves were substituted for solenoid valves of another i

manufacturer that did not meet the requirements of IE Bulletin No. 79-01 and j

its amendments, licensees and holders of construction permits should take into account the problem identified in this Information Notice prior to making any I

similar substitution.

BACKGROUND:

By TWX dated June 27, 1980, Valcor submitted a preliminary 10 CFR Part 21 Report addressing the malfunctioniag af Valcor solenoid valves at the McGuire facility.

The malfunctioning valves have been identified as Valcor Valve Model No. V52600-554-1.

This TWX was subsequently followed by a letter dated July 3, 1980, transmitting a more detailed Part 21 Report entitled, " Quality l

Assurance Report", a copy of which is attached hereto as Enclosure No. 1.

1 In brief, the malfunction appears to be an intermittent type wherein the valve fails to cycle from OPEN to CLOSE to OPEN immediately after a sustained period i

of operat! in in the energized (OPEN) mode.

Although the valves are rated for

" continuous operation", Valcor contends that the valves were not designed to meet the operating conditions requiring the immediate cycling from OPEN to I

CLOSE to OPEN after a sustained period of continuous energization.

A major source of the problem, therefore, may be a misunderstanding of the term

" continuous operation".

By letter dated July 14, 1980 to Duke Power Company, l

his matter entitled, " Outline -

of which is attached hereto as DUPLICATE DOCUMENT Entire document previously entered into system under:

ANO h M M k f M k No. of psges:

l l

l

--