Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML19340C739
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/24/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
GL-80-89, NUDOCS 8012170322
Download: ML19340C739 (1)


Text

.

- ;isr<AL FILES

p "c*

UNITED STATES PDR:HQ

/'

.s' Lr ')R NUCLEAR REGULATORY COMMISSION 77c

-[,IEh i REGION IV N3IC an 1,N..N.[ yf ill1 RYAN PLAZA : RIVE. SulTE '000 ARUNGTON. TEXAS 76011 I Ic Cc:cber 2!.,

1980

,m, Occket Nos.

50-313

.c.

50-368 5.c Arkansas ?cwer and Light Cc=pany

=:

c F.. g

.C".'i : Mr. Wi nia= Cavanaugh !~~

~.

y 71:e President of Generatien R

g y

and Construe:1ca Ja

?. O. 3ox 551 Li::le Rock, Arkansas 72203 Gentle =en:

Enciesed is II Supple =ent No. 3 :o Sunecin 79-013.

~his supple =en: clarifies

so issues raised by Supple =en: No. 2.

These are:

(1) :he sub=1: 21 of quali-fication inic :ation for equip =ent resul:1ng frc= "MI Action Plan require =ents,

and (2) the qualification of equip =en: vnich is required :c achieve a cold shu:dcwn Ocedi:ica.

?.is action is 2 resul: of industry feedback :o NRC regarding ince precation ci Supple =en: No. 2.

~he infer =atica presented is applicable to your sub=1::a1 regarding enviren= ental qualificacica of Class 12 equip =en: which is required by Nove=ber 1,1980.

Should 7cu have questicus regarding :his Supple =en: please ecc:ac: -J11s cifice.

Sincerely, f 1

/

/

e.

4/

/ /.

n

/JC,(

'. W of Karl '/. Seyfri:'

Diracecr

/t Inclosures :

1.

II Supple =ene No. 3 :o i

3unecin No.79-013 2.

List of Recently Issued

'I SuH ec1ss l

Ja=es ?. O'?anien, ?lan: Manager i

Arkansas Nuclear Cne

?. O. 3cx 608 l

Russe nvine, Arkansas 72801 701 M Q

l

SSINS No.:

6820 Accession No.-

8008220248 UNITED STATES s

NUCLEAR REGULATORY COMMISSION I

0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555

/

IE Bulletin No. 79-013 Supplement No. 3 D'te: October 24, 1980 a

Page 1 of 2 Description of Circumstances:

Two issues were raised by Supplement No. 2 which require clarification. These (1) the dates required for submittal of qualification information for are:

TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally c,ualified if the licensing basis for the plant was a Hot Safe Shutdown condition.

(1) Supplement No. 2 (Q.1, Q.5) addressed the micimum cold shutdown require-ments. The staff position on this issue is that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achieving and maintaining a cold shutdown condition.

The equioment of other paths must be reviewed to assure that its failure will ac. aggravate or contribute to the accident (ref. Q.5 Supplement No. 2).

Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear. Therefore, the following will apply:

The qualification information for equipment needed to achieve and a.

maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.

b.

The qualification information for equipment required to achieve and maintain a Cold Shutdown cond: tion (ref. Q.1 and Q.5 of Supplement No. 2) must be submitted not later than February 1,1981.

(2)

IE3 79-013 required a 90 day response which was due in mid-April 1980.

Supplement 1 (Feb.1980) informed licensees that equipment which was

" planned" to be installed as a result of lessons learned need not be addressed in that response.

Some of this equipment has since been installed. Supplement No. 2 _(Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal.

This position represents no change in staff position regarding the scope of the review. However, since the staff position on this issue was unclear the following will apply:

iE Bulletin No.79-01B Supplement No. 3 Date:

October 24, 1980 Page 2 of 2 Qualification informatica for installed TMI Action Plan equipment a.

must be submitted by February 1, 1981.

b.

Qualification information for future TMI Action Plan equipment (ref.

NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.

Qualification information for IMI Action Plan equipment currently c.

under NRC review should be submitted as soon as possible.

d.

Qualification information for IMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review by the implementation date.

The above items 1 and 2 represent no change in staff position regarding the scope of the 79-013 Supplement 2 review.

II Bu11etta No.79-013 was issued under a blanket GA0 clearance (3130225 (R0072), clearance expired July 31, 1980) specifieslly for identified generic prob 12ms.

Supplement No. 3 to Bulletin 79-013 is for information, hence no GA0 clearance is required.

t

-V V

IE Bulletin No. 79-013 Supplement No. 3 October 24, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture 30-19 Failures of Mercury-Wetted 7/31/80 All nuclear power Matrix Relays in Reactor facilities having Protective Systems of either an Operating Operating Nuclear Power License (0L) or a Plants Desirned by Combus-Construction Permit (CP) tion Engineering 30-20 Failures of Westinghouse 7/31/30 to each nuclear Type W-2 Spring Return power facility.a to Neutral Control your region having Switches an Operating License (OL) or a Construction Permit (CP)

Sup. 3 Failure of Control Rods 8/22/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding at a BWR Operating Licenses (OLs) or Construction Permits (cps)

I 79-26 Baron Loss from SWR 8/29/80 All BWR power facilities Rev. 1 control blades with an Operating License (OL) 80-22 Automation Industries, 9/11/80 All radiography Model 200-520-008 sealed licensees l

sources connectors i

Suo. 2-Environmental Qualifica-9/30/80 All power reactor to 79-013 tion of Class IE facilities with an squipment Operating License'(OL) t l

Enclosure l