_
-==e?"riRAL FILES uNiTEo STATES PCR:HQ
.7 LPDR
- +
NUCLEAR REGULATORY COMMISSION
!, hd* -):
TIC aEoioN iv NSIC 1,N.......,
f
$11 RYAN Pt.AZA DRIVE. SulTE t000 ARUNGroN TEXAS 76011 g i I:
October 24, 1980
.7 5-Occia: No.
50-298 J:
Nebraska Public ?0wer Dis ric:
h Y
AC.i:
J. M. ?ilan:, Director j'
o e.)
Licensing & Quali:7 Assurance
?cs: Office Sox 499 Colt:mbus, Nebraska 68601 Gen:lemen:
Inclosed is II Suppla=en: No. 3 :o 3u11ecia 79-013.
'his supple =ent clarifies
- wo issues raised by Supple =en: No. 2.
These are:
(1) che sub=1::a1 of quali-fica:1:n informatica for equipmen: resul:1ng frem M Ac:icn ?lan requira-an:3, and (2) :he qualifica:1cn of equipmen: which is required :: achieve a Ocid shu:dcwn :: di:ics.
'c.is ac:icn is a resul: Of indus:r7 feedback :o NRC regarding interpre:a:ics of Supple =en: No. 2.
'he inferna:icn presen:ed is applicabla to your submi::21 regarding envir:n=en:21 qualifica:ica of Class 12 equip =en: which is required by Nove=cer 1, 1980.
Shculd ycu have questions regarding :his Supplenen: please cen:ac: -his cift:e.
Sincerely,
[ C 6]./
$;L b b5 Karl 7. Seyirei:/,
Director Ene10sures:
1.
II Supplemen: No. 3 :o 3u11ecin No.79-013 2.
'is: of Recen:17 ssued
- I 3u11e:1=s
- c:
.. C. lessor, Superintenden:
Cooper Nuciaar 3:acion
?os: Office Sox 98 3rowev111e, Neorasia 68321 2o3t5 Q
3o121
SSINS No.:
6820 Accession No.:
3008220248 UNITED STATES s
NUCI. EAR REGUI.ATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 IE Bulletin No.79-01B Supplement No. 3 Date:
October 24, 1980 Page 1 of 2 Description of Circumstances:
Two issues were raised by Supplement No. 2 which require clarification. These (1) the dates required for submittal of qualification information for are:
TMI reisted equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally qualified if the licensing basis for the plant was a Hot Safe Shutdown condition.
(1) Supplement No. 2 (Q.1, Q.5) uddressed the minimum cold shutdown require-meats.
The staff position on this issue is that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achieving and maintaining a cold shutdown condition.
The equipment of other paths must be reviewed to assure that its failure will not aggravate or contribute to the accident (ref. Q.5 Supplement No. 2).
Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear.
Therefore, the following will apply:
a.
The qualification information for equipment needed to achieve and maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.
b.
The qualification information for equipment required to achieve and maintain a Cold Shutdown condition (ref. Q.1 and Q.5 of Supplement No. 2) must be submitted not later than February 1,1981.
(2)
IEB 79-01B required a 90 day response which was due in mid-April 1980.
Supplement 1 (Feb.1980) informed licensees that equipment which was
planned" to be installed as a result of lessons learned need not be addressed in that response. Some of this equipment has since been ins talled.
Supplement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be traated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal. This position represents no change in staff position regarding the scope of the review..However, since the staff position on this issue was unclear the following will apply:
x-IE Bulletin No.79-01B Supplement No. 3 Date: October 24, 1980 Page 2 of 2 Qualification information for installed TMI Action Plan equipment a.
must be submitted by February 1, 1981.
b.
' Qualification information for future TMI Action Plan equipment (ref.
NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.
Qualification information for IMI Action Plan equipment currently c.
under NRC review should be submitted as soon as possible.
d.
Qualification information for TMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review by the implementation date.
The above items 1 and 2 represent no change in staff position regarding tne scope of the 79-013 Supplement 2 review.
IE Bulletin No. 79-013 was issued under a blanket GA0 clearance (3180225 (R0072), clearance expired July 31, 1980) specifically for identified generic problems.
Supplement No. 3 to Bulletin 79-013 is for information, hence no GAO clearance is required.
1 I
f f
- ~ - -
~
v a
w e,
i IE Bulletin No.79-01B Supplement No. 3 October 24, 1980 RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.
30-18 Maintenance of Adequate 7/24/30 All PWR power reactor Minimum Flow Thru Centrifugal
' facilities holding OLs Charging Peeps Following and to those PVRs Secondary Side High Energy nearing licensing Line Rupture 30-19 Failures of Mercury-Wetted 7/31/30 All nuclear power Matrix Relays in Reactor facilities having Protective Systems of either an Operating Operating Nuclear Power License (OL) or a Plants Designed by Combus-Construction Permit (CP) tion Engineering 30-20 Failures of Westinghouse 7/31/30 To each nuclear Type V-2 Spring Return power facility in to. Neutral Control your region having Switches an Operating License (OL) or a Construction l
Permit (CP)
Sup. 3 Failure of Control Rods 3/22/80 All 3WR power reactor to 30-17 to Insert During a Scram facilities holding at a BWR Operating Licenses (OLs) or Construction Permits (cps) 79-26 Boron Loss from BWR 3/29/30 All BWR power facilities Rev. I control blades with an Operating License (OL) 80-22 Automation Industries, 9/11/80 All radiography i
Model 200-520-008 sealed licensees sources Connectors Sup. 2 Environmental Qualifica-9/30/80 All power reactor to 79-013 tion of Class IE facilities with an Equipment Operating License (OL)
Enclosure
+-aw 9
e-w
.e s,-
.gw,
,y c. y w
-grw-,
-m esT 'N-'
D'-
"F'M"
""'-T'"
' 4 '
~W f
---"'T
"'7