Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML19340C732
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/24/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8012170312
Download: ML19340C732 (1)


Text

.

M 4 TRAL TILE 3

  • f.a mO'.$*

UNITID STATES DDR:HQ LPOR r.

NUCt. EAR REGULATORY COMMISSION IIC i

4,i,

^/

e REGICN IV N3[C

.5

<t i'h"<N.t /

411 RYAN PLAZA ORIVE. SUITE '000 AAUNGTON. TEXAS 76011 3IAIE Cc::bar 2!*,

1980 Occke: No. 50-267 P=

7 Public Service Ccmpany of Colorado

.CI: Mr. C. I. Millen P-Senior 71ce ? esiden:

fl,

?. O. 3cx 340 2

5

~ -

n Oenver, Colorado 30201 g

-3 a

J Gentlemen:

Inclosed is II Supplemen: No. 3 :o 3ulle:in 79-013.

his supple =en: clarifies

vo issues raised by Supplemen: No. 2.
  • hese are:

(1) :he submi::a1 of quali-fica:ica infor=a:1cn for equipmen: resul:1ng f := 2"I Ac:1ca Plan requirements,

and (2) :he qualift:a:1:n Of equip =en: which is :equired :o achieve a cold shu devn endi:1:n.

~'his ac:icn it a resul: Of industr7 feedback :o NRC regarding in:e: pre:2:1:n of Supple =en: No. 2.

~'he ini r=aci:n presented is applicable to your subst::a1 regarding en ri::n=en:21 qualift:stian of Class II equipment vnich is required by Nove=cer 1,1980.

Shculd you have ques:1:ns regarding :his Supplemen: please con ac: -his Office.

Sincerely,

/

~%,b I

Kari 7. Sayi:1 Director Inclosures:

1.

II Supplemen: No. 3 :s 3ulle:1n No. 79,-013 2.

'.is: of Recently Issued l

I 3u11ecins

3. V. Varembourg, Nuclear ?recuctica Manager For: 3t. 7:als Nuclear Sca 1cn

?. O. Box 368 Plattev:.11a, Colorado 3C651 L. 3 rey, Manager, Quali::7 Assurance 7 0 JIM 80121 g

SSINS No.:

6820 Accession No.:

8008220248 UNITED STATES NUCI. EAR REGUI.ATORY CCMMISSION OFFICE OF INSPECTION AND ENFORCEMENT J

I b

WASHINGTON, D.C.

20555 IE Bulletin No. 79-013 Supplement No. 3 Date: October 24, 1980 Page 1 of 2 Description of Circumstances:

Two issues w re raised by Supplement No. 2 which require clarification.

These (1) the dates required for submittal of qualification information for are:

TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be envirocmentally qualified if the licensing basis for the plant was a Hot Safe Shutdown condition.

(1) Supplement No. 2 (Q.1, Q.5) addressed the minimum cold shutdown require-ments.

The staff position on this issue is that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achievirg and maintaining a cold shutdown condition.

The equipment of other paths uust be reviewed to assure that its failure will not aggravate or contribute to the accident (ref. Q.5 Supplement No. 2).

Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclesr.

Therefore, the following will apply:

The qualification information for equipment needed to achieve and a.

maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.

l b.

The qualification information for equipment required to achieve and l

maintain a Cold Shutdown condition (ref. Q.1 and Q.5 of Supplement l

.lo. 2) cust be submitted not later than February 1, 1981.

i

(

(2)

IES79-01B required a 90 day response which was due in mid-April 1980.

l Supplement 1 (Feb.1980) informed licensees that equipment which was l

" planned" to be installed as a result of lessons learned need not be l

addressed in that response.

Some of this equipment has since been installed.

Supplement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal. This position represents no change in l

staff position regarding the scope of the review.

However, since the staff position on this issue was unclear the following will apply:

1

_~._.

i 1

IE Bulletin No.79-01B Supplement No. 3 Date: October 2'.,

1980 Page 2 of 2 1

Qualification information for installed IMI Action Plan equipment mast be submit ad by February 1,1981.

i b.

Qualific

. formation for future TMI Action Plan equipment (ref.

NUREG-07 issued), which requires VRC pre-implementation

review, Jubmitted with the pre-implementation review data.

Qualifict

.foonation for TMI Action Plan equipment currently

~ '

under NRL... tew should be submitted as soon as possible.

3.

Qualification information for TMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review cy the implementation date.

The above items 1 and 2 represent no change in staff position regarding the 3

scope of the 79-013 Supplement 2 review.

IE Bulletin No.79-01B war issued under a blanket GA0 clearance (3180225 (R0072), clearance expired July 31, 1980) specifically for identified generic problems. Supplement No. 3 to Bulletin 79-013 is for information, hence no 4

GA0 clearance is required.

4 4

I 1

1 P

}

4 y

w,,. -.,

,s

.y..

.c..,_,r

-,,y__.,,

,.,.,,_.__.._,,..m..

_ = _ _.

l IE Bulletin No.79-01B Supplement No. 3 October 24, 1980 4

l RECENTLY ISSUED IE BULLETINS Bulletin Subject Date Issued Issued To No.

80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs 3

Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture i

80-19 Failures of Mercury-Wetted 7/31/80 All nuclear power Matrix Relays in Reactor facilities having

}

Protective Systems of either an Operating Operating Nuclear Power License (OL) or a Plants Designed by Combus-Construction Permit (CP) tion Engineering 30-20 Failures of Westinghouse 7/31/80 To each nuclear Type W-2 Spring Return power facility in to Neutral Control your region having Switches an Operating License (OL) or a Censtruction Permit (CP)

Sup. 3 Failure of Control Rods 3/22/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding at a 3WR Operating Licenses (OLs) or Construction Permits 1

(cps) 79-26 Boron Loss from BWR 8/29/80 All BWR power facilities Rev. I control blades with an Operating License (OL) 80-22 Automation Industries, 9/11/80 All radiography Model 200-520-008 sealed licensees sources Connectors i

Sup. 2 Environmental Qualifica-9/30/80 All power reacter to 79-013 tion of Class II facilities with an Equipment Operating License (OL)

Enclosure i

}