ML19340C366
| ML19340C366 | |
| Person / Time | |
|---|---|
| Issue date: | 10/27/1980 |
| From: | Advisory Committee on Reactor Safeguards |
| To: | Advisory Committee on Reactor Safeguards |
| References | |
| ACRS-MS-0604, ACRS-MS-604, NUDOCS 8011140643 | |
| Download: ML19340C366 (4) | |
Text
..
M5-D&&.
)*
l b.1 l UNITED STATES I I
'g NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
/
c
/
W ASHINGTON, D. C. 20555 o
%,.... /
October 27, 1980 e
r SCHEDULE AND OUTLINE FOR DISCUSSION 247TH ACRS MEETING
~
NOVEMBER 6-8, 1980 WASHINGTON, DC h
Thursday, November 6,1980, Room 1046,1717 H Street, NW, Washington, DC 1) 8:30 A.M. -10:00 A.M.
Opening Session (0 pen) 1.1) 8:30 A.M.-8:45 A.M.: ACRS Chairman's Report (MSP/RFF) 1.2) 8:45 A.M.-9:00 A.M.:
Report of ACRS Nominating Panel regarding candi-dates for ACRS Chainnan and Vice-Chairman for CY 1981 (SL/RFF) 1.3) 9:00 A.M.-10:00 A.M.:
Discuss topics for meeting with Gov. Bruce Babbitt, Chairman, Nuclear Safety Oversight Committee:
1.3-1) Methods to strengthen the ACRS role in tne regulatory process (MB/RFF) 2)
10:00 A.M. - 12:00 Noon Meeting with Gov. Bruce Babbitt, Chairman, Nuclear Safety Oversight Committee (0 pen) 12:00 Noon - 1 :00 P.M.
LUNCH 3) 1:00 P.M. - 2:00 P.M.
Discuss items for meeting with NRC Chairman and Comissioners (0 pen) 3.1) Use of risk assessment by NRC Staff to estabiish priority for regulatory actions (e.g., seismic design of auxiliary feedwater systems)(D0) 3.2) Clarification of Comm. V. Gilinsky's request for ACRS/NRC Staff considera-tion of changes to decay heat removal systems in the North Anna Nuclear Plant Unit 2 (D0) 3.3)
Interim response to request from Chair-man J. F. Ahearne regarding new safety concepts for new nuclear power plant designs (00) 3.4) Proposed change in format / conclusion in ACRS reports per suggestion by Commissioner V. Gilinsky (WK) 8011140 g43 i
247TH Mtg. Schedule 1 4) 2:00 P.M. - 3:00 P.M.
Meeting with NRC Chairman and Commission-ers (0 pen) - Discuss items noted above 5) 3:00 P.M. - 6:30 P.M.
General Electric Test Reactor (0 pen) 5.1) 3:00 P.M. - 3:30 P.M.:
Report of ACRS Succommittee regarding seismic modifications and proposed operation (WK/EI) 5.2) 3:30 P.M. - 6:30 P.M.:
Meeting with representatives of the NRC 1
Staff and the applicant (Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to this project.)
Friday, November 7,1980, Room 1046,1717 H Street, NW, Washington, DC 6) 8:30 A.M. - 9:15 A.M.
Meeting with NRC Staff (0 pen) 6.1) Report regarding status of TMI-2 recovery program.
(Note: Portions of this session will be closed as necessary to dis-cuss Pr oprietary Information appli-cable to this project.)
7) 9:15 A.M. - 11:15 A.M.
Diablo Canyon Nuclear Plant (0 pen) 7.1) 9:15 A.M. - 9:45 A.M.:
Report of ACRS Subcommittee regarding seismic interaction study (D0/RS) 7.2) 9:45 A.M. - 11:15 A.M.:
Meeting with representatives of the NRC Staff and the applicant.
(Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to this project.)
- 8) 11:15 A.M. - 12:15 P.M.
BWR Hydraulic Scram Systems - Discuss pro-posed ACRS report to NRC (0 pen) (00/HE/ALB) 12:15 P.M. - 1 :15 P.M.
LUNCH
247TH Mtg. Schedule 9) 1:15 P.M. - 3:15 P.M.
NRC Regulatory Guide 1.97, Revision 2, Instrumentation for Lignt-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Fol-lowing an Accident (0 pen) 9.1) 1:15 P.M. - 1:30 P.M.:
Report of ACRS Subconinittee (CPS /EI) 9.2) 1:30 P.M. - 3:15 P.M.:
Meeting with representatives of NRC Staff and the nuclear industry as appro-priate
- 10) 3:15 P.M. - 3:30 P.M.
Future schedule (0 pen) 10.1) Anticipated full Committee activ-ity (RFF) 10.2) Anticipated Subcommittee activity (MWL)
- 11) 3:30 P.M1 - 3:45 P.M.
Regulatory Activities (0 pen) 11.1) Report of Subcommittee regarding Regulatory Guide 1.12, Revision 2, Instrumentation for Earthquakes (CPS /SD)
- 12) 3:45 P.M -
6:30 P.M.
ACRS Reports / Letters to NRC (0 pen) 12.1) Diablo Canyon Nuclear Plant (D0/RS) 12.2) BWR Hydraulic Scram Systems (00/JE/ALB) 12.3) New safety concepts for new nuclear power plant designs - interim reply (00/RS) 12.4) Proposed ACRS letter regarding the Nuclear Data Link (WK/JB/GRQ)
(Note: Portions of this session will be closed as necessary to discuss Proprietary Information applicable to these subjects.)
I
247TH Mtg. Schedule Saturday, November 8,1980, Room 1046,1717 H Street, NW, Washington, DC
- 13) 8:30 A.M. - 10:00 A.M.
ACRS Reports to NRC (0 pen) 13.1) General Electric Test Reac-tor (WK/EI) 13.2) Regulatory Guide 1.97, Revision 2, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following An Accident (CPS /SD) 13.3) Nuclear Data Link (WK/JB/GRQ) 14) 10:00 A.M.- 12:00 Noon NRC Interim Reouirements Related to Hydrogen Control and Certain Degraded Core Considerations (10 CFR Part 50)
(0 pen) 14.1) 10:00 A.M.-10:30 A.M.:
Report of ACRS Subcommittee on Regulatory Activities (CPS /SD) 14.2) 10:30 A.M.-12:00 Noon: Meeting with representatives of NRC Staff and the nuclear industry as appro-priate.
- 15) 12: Noon - 12:45 P.M.
Meeting with NRC Staff (0 pen) 15.1) Report regarding status of design /
research effort to develop a sys-tem for the control of combustible gasses for the Sequoyah Nuclear Plant.
I 12:45 P.M. - 1:45 P.M.
LUNCH 16) 1:45 P.M. - 3:15 P.M.
Generic Items Acolicable to Light Water Reactors (0 pen) (PGS et al/RKM et al) 16.1) Reports of-designated Subcommittee Chairmen regarding the status of ACRS generic items applicable to LWRs.
17) 3:15 P.M. - 4:00 P.M.
Miscellaneous (0 pen / Closed) 17.1) Report by ACRS Chairman regarding meetings with RSK/FRG representa-tives and JAERI representatives (Closed)(MSP) 17.2) Invitation for paper by Dr. W. Kerr regarding Simulation Methods for Nuclear Power Systems (0 pen)(WK)
_