ML19340C362

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Required
ML19340C362
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 10/31/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pollock M
LONG ISLAND LIGHTING CO.
References
NUDOCS 8011140620
Download: ML19340C362 (1)


Text

_-

f.*ky.p 1

s suusg g

4 p j t_

g'o, UNITED STATES y, g('

g NUCLEAR REGULATORY COMMISSION

[

v "E

REGION I

/gh o,\\, ' V

[

631 PARK AVENUE

,o KING oF PRUSSIA, PENNSYLVANIA 19406 y

c>

October 31, 1980 J

g

~'

g;;

3-jg Docket No. 50-322

?zI, gs Long Island Lighting Company

!J,Y;b Ty jdB ATTN:

Mr. M. S. Pollock y

S f-j Vice President - Nuclear M

S 175 East Old Country Road EI!

Hicksville, New York 11801 Gentlemen:

The enclosed IE Information Notice No. 80-39, " Malfunctions of Solenoid Valves Manufactured by Valcor Engineering Corporation," is forwarded to you for information.

No written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely, 7

So e H. Grier Director

Enclosures:

1.

IE Information Notice No. 80-39 2.

List of Recently Issued IE Information Notices CONTACT:

D. L. Caphton (215-337-5266) cc w/encis:

J. P. Novarro, Project Manager Edward M. Barrett, Esquire Edward J. Walsh, Esquire T. F. Gerecke, Manager, Engineering QA Department 8011140 Q o i

SSINS No.:

6835 Acesssion Ns.:

8008220245 IN 80-39 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C. 20555 October 31, 1980 IE INFORMATION NOTICE NO. 80-39: MALFUNCTION OF SOLENOID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION PURPOSE:

The intent of this Information Notice is to alert holders of construction permits and cperating ifcenses for nuclear power plants of a potentially generic problem involving the malfunctioning of certain solenoid valves manu-factured by the Valcor Engineering Corporation (Valcor).

The solenoid valves so involved are designated as Valcor Valve Model No. V52600-554-1.

Valcor has informed us that these valves have only been supplied to the McGuire facility; however, since these valves were substituted for solenoid valves of another manufacturer that did not meet the requirements of IE Bulletin.No. 79-01 and its amendments, licensees and holders of construction permits should take into account the problem identified in this Information Notice prior to making any similar substitution.

BACXGROUNO:

By TWX dated June 27, 1980, Valcor submitted a preliminary 10 CFR Part 21 Report addressing the malfunctioning of Valcor solenoid valves at the McGuire facility.

The malfunctioning valves have been identified as Valcor Valve Model No. 52500-554-1.

This TVX was subsequently followed by a letter dated July 3,1980, transmitting a more detailed Part 21 Report entitled," Quality Assurance Report", a copy of which is attached hereto as Enclosure No.1.

In brief, the malfunction appears to be an intermittent type wherein the valve fails to cycle frcm OPEN to CLOSE to OPEN immediately after a sustained period of operation in the energized (OPEN) mode.

Although the valves are rated for

" continuous operation", Valcor contends that the valves were not designed to meet the operating conditions requiring the immediate cycling from GPEN to CLOSE to OPEN after a sustained period of continuous energi:ation.

A major source of the problem, therefore, may be a misunderstanding of the term

" continuous operation".

By latter dated July 14, 1980 to Duke Power Company, Valcor transmitted its recommendations in this matter entitled, " Outline -

Suggested Modification Procedures", a copy of which is attached hereto as Enclosure No. 2.

Enclosures; DUPLICATE DOCUMENT Entire document previously entered into system under:

NhMh ANO b

No.. of pages:

O