Monthly Operating Rept for Oct 1980
ML19340B870
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/06/1980
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML19340B866 List:
References
NUDOCS 8011120487
Download: ML19340B870 (9)


Text

_ ___

b i

O OPERATING DATA REPORT DOCKET NO.50-32o DATE Novembar 1980 COMPLETED IlY . 70 %1t TELEPHONE /2Mi"2-3840 OPERATING STATUS Fit: Patrick Notes

1. Unit Name:
2. Reporting Period: 00100 ~00 0N
3. Licensed Thermal Power (MWt): '4'#
4. Nameplate Rating (Gross MWe): 882
5. Design Electrical Rating (Net MWe): 821
6. Maximum Dependable Capacity (Gross MWe): d30
7. Maximum Dependable Capacity (Net MWe):

o10

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum dependable capacity (net MWe) was increased from 800 MWe to. A10 MWe on October 26. 1080.

9. Power Level To Which Restricted,if Any (Net MWe):

NM

10. Reasons For Restrictions,if Any:

'Ihis Month Yr.-to-Date Cumulatise

11. Hours In Reporting Period 745 7320 46153
12. Number Of Hours Reactor Was Critical 004 7 4019.0 31450
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On.Line o52.o 4700.o 3043o.o
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 'hC6'oA 9496392 60684586
17. Gross Electrical Energy Generated (MWH) 509G20 1252340 20606130
18. Net Electrical Energy Generated (MWH) a88985 3149280 10939855
19. Unit Service Factor 87.6% 64.25 66.0%
20. Unit Availability Factor 87.6% 64.2% 66.O%
21. Unit Capacity Factor (Using MDC Net) 81 8% 53.8' 58.7%
22. Unit Capacity Factor (Using DER Net) . 79.9% 52.4% E.2.6%
23. Unit Forced Outage Rate 12.4% 5.2% 18.o%
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

Scheduled Snubber Insnection and Maintenance Cutace in January, 1o81 for accroximately 10 days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION I

l

AVERAGE DAILY UNIT POhER LEVEL DOCKET NO. 333 UNIT JAFMPP DATE N0 EMBER 1980 COMPLETED BY E, ZUFELT TELEPilONE (315)342-3840 MONTH OCTOBER 1980 l

DAY AVER AGE DAILY' POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4 (MWe-Net) (MWe Net) i 808 37 128 2

810 is 429 j

3 Roo 19 991 4 810 20 6R1 5 811 21 773

, 6 812 22 760 7 813 23 771 8 811 24 75' 9 812 25 517 10 812 26 717 11 812 27 801 12 8'2 28 81h 13 451 29 817 14 0 30 818 l 15 0 3 817 16 0 4

SUMMARY

UNIT OPERATED AT NEAR 100% OF RATED THERMAL POWER

, FOR THIS REPORTING PERIOD. ON OCTOBER 13, 1980 i

THE UNIT SCRAMED DUE TO LOSS'0F "B" RPS MG SET.

I i

UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50_1aa UNIT NAM E .T APtJ PP DATE flOVEMBER 1080 COMPLETED BY E. 711VF T JP REPORT MONTH OC'I'OBER 1980 TELEPilONE (115194?-18210 e.

c N  % uE c .

Ni s . Date "E., 5 ?gy Licensee Event

,E% $'" Cause & Corrective p 3J 0 5 3 oc g? gUo Action to OO M $ 373 g Report = v) O o Prevent Recurrence

O O

17 801013 F 92.2 11 3 IIA IA GEtJERA Loss of "B" RPS MG Set.

18 8010211 S 0 11 Il IIA flA f1A Power reduced for control rod pat, tern change.

Y LD '

M W

b w

I 2 F: Forced Reason:

3 Method:

4 Exhibit G. Instructions M

S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data 7d B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C. Refueling 3-Automatic Scram. Event Report (LER) File (NUREC.

D-Regulatory Restriction 4 Other (Explain) 0161) 1 E Operator Training & License Examination !3 F.Ad mmist rative 5 G Operational Error (Explain) ES5it 1.Same Souree Il-Ot he r (E xplain)

=

l POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE CCTOBER, 1980 The unit operated at near 100% rated thermal power for this reporting period.

The Reactor scrammed on October 13, 1980 due to the loss of the "B" Reactor Protection system motor generator set.

On October 24, 1980, power was reduced for control rod pattern changes and at the end of the reporting period, the unit is operating at approximately 840 Mde.

The maximum dependable capacity net MWe was increased from 800 MWe to 810 MWe on October 26, 1980 based on a recent Authority evaluation of plant operation and performance.

l

't

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT .

SAFETY RELATED ELECTRICAL 8 MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM M ST HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T r)/23 13 7564 OPS Missing taper pin Replaced taper pin 3 l' IIOV-2 9/26 03 8317 OPS Worn plug Replaced seat, plug & diaphragm 6 PCV-129A 9/28 00 6504 N/A N/A Performed visual inspection 60 Snubbers 9/18 10 5936 visual URC Bulletin 79-02 Modified 1110-206 108 1110-206 9/23 10 5950 Visual MRC Bulletin 79-02 Modified 1110-164 1914 1110-164 9/23 10 5945 Visual URC Bulletin 79-02 Modirled PPSK-1112 182b PFSK-lll2 9/23 10 5941 Visual MRC Bulletin 79-02 Modified 1110-542 641 1110-542 9/23 10 5178 Visual NRC Bulletin 79-02 Modirled 1110-205 132 1110-205 9/26 66 5937 Visual NRC Bulletin 79-02 Modirled 1166-12 25 1166-12 9/27 10 5953 Visual NRC Bulletin 70-02 Modirled PFSK-C 17 PPSK-C 9/27 19 5951 Visual URC Bulletin 79-02 Modirled 1119-218 373 1119-218 l

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

DATE SYSTEM

" HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T T

9/30 10 5919 Visual flRC Bulletin 79-02 Modit'ied 1110-80 272 3/4 1110-80 10/2 14 5956 Visual 11RC Bulletin 79-02 Mod i t'ied 1114-10 62 1114-10 10/2 15 5954 Visual f1RC Bulletin 79-02 Mod i f'ied 1115-165 90 1115-165 10/2 66 5952 Visual 11RC Bulletin 79-02 Modi f'i ed 1166-34 387k 1166-34 10/2 15 5240 Visual 11RC Bulletin 79-02 Modi 1'ied 1115-303 4 1115-303 10/6 23 9236 Visual Saturated steam Replaced 90 elbow 16 1" WD 902-2; impingement 10/3 10 5955 Visual llRC Bulletin 79-02 Mod i f'ied 1110-135 240b 1110-135 10/3 23 9158 OPS Sticking position Replaced switch 4 110V- 2 switch 10/15 05 11416  !!a int . Dept. Cable damaged during Installed approved cable splice 9 1RPSASCl38 penetration sealing 10/15 13 9336 Visual Worn packing Repacked 4 RCI 698 10/15 14 8188 Visual Body-bonnet leak - Installed gasket 15 MOV-5B Valve had been assemble 3 without gasket

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT -

SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE

SUMMARY

ST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 10/16 02 8097 Visual Worn Packing Torqued packing 10 MOV-53B

>0/15 10 8270 OPS Misadjusted limit Adjusted switch actuating arm 3 RiiH-81A switch actuating arm 10/14 29 9161 OPS Loose arm on valve Tightened limit switch arm 4 AOV-80A position switch 10/18 'll 606 Maint. Dept. flone . Preventive Cleaned battery cells 12 SB-1, 2 Maintenance LO/17 10 5959 Visual flRC Bulletin 79-02 Modiried lilo-32A 132 Il10-32A 10/11 76 5958 Visual NRC Bulletin 79-02 Modirled H76-1 151 117 6 - 1 LO/21 71 8054 OPS Derective switch and Heplaced contact block in switch 17 BC-1, B ground relay and installed new relays t0/23 76 11511 surveillance Cable conductor caught Moved cable and installed tie- 9 PAllEL 6 in relay mechanism wrap t0/22 27 11489 OPS Broken diaphragm Replaced diaphragm 12 PllB

POWER AUTHORITY OF THE STATE OF NEW YORK ~

JAMES A. FITZPATRICK NUCLEAR POWER PLANT ..

MAINTENANCE

SUMMARY

OCTOBER 1980 I&C ACTION TAKEN REPAIR WORK REQUEST # CAUSE OF RESULTS OF TIME DUECTED MALFUNCTION TO PRECLUDE DATE SYSTEM MALFUNCTION RECURRENCE HOURS COMPONENT #

OPS Unknown Incorrect Performed 2 10/1 02-3 8395 surveillance LI-85B indication 11410 I&C 11/A MG-Set trip Checked corinec- 6 10/14 05 tion & performed RPS-MG-B TMP 5.?

OPS Out of Drift Per formed 2 10/1 07 5997 tolerance IMP 7.6 APRM "E" I&C Construction no output Replaced pur. 5 10/15 07 11427 supply PS-317 worker caused OPS Unknown Erratic Replaced 90 10/15 07 74 4 connectors "D"

OPS Unknown  !!o indication Replaced 60 10/19 07 7498 connectors IRM "B"-

10/25 14 9363 OPS Unkriown Intermittent Hpl. sensor, 35 LS-20B alarms ekt. board /cabl e OPS Unknown Constant alarm Repaired 40 9/29 17 8306 .

FS-001A OPS Recorder dirty Monitor & Cleaned, 4 10/25 17 9163 RLS-459 """, "d*" d "D "I # '"d 8391 OPS 11ormal wear Incorrect Rpl. check 18 9/27 17 indication source & drive R13-456A 10/1 17 8240 I&C Calibration 11/A ISP-19 15 test equip out RM-150B of enlibration

lflII

~

R S AIER P MU 5 0 1

4 E Ol R TH NE EDE KUC d ALN e TCE t 1 d ER a - e NRR OP r 4 t s

I U br 6 D T C ie - u COE lt P j ATR ae S d Cm I A FN K T OO R n STI t o t ON TC LN ci cs Y LA UU et ra eg rn SF rc WP E

EL RA oi A

ri od ca M cd N E R nn / ne Ii l f I r FW OOP Y 'l E R N o n

TR AA A

M C FIO OT C i og TE M T EN tj n S L U SU a r ;,

C S 0 UF w E U 8 A L b ll o 9 CA i n H N T

E C

1 M A

/

l%

aj j k

n K N R N Cg U F C A E OI N B R E O T D YT T N C E T PA I

O T C

AI R Z M E

T O

HI T E D

TF U .

S C S AA P O

I P

O RS EE WM OA #

PJ .

T # C S

E T ,

U N Q E A A A E N l 1 1 R O S 5 0 P 8 2 9 2 3 1 K 8 t- 3 - 9 -

R M O 2 f 2 M 3 I O C 8R 8 R 9L W

M E

T S

Y 7 7 3 S 1 1 9 5

1 1 2 E / / /

T 0 0 0 A 1 1 1 D

-