ML19340B531

From kanterella
Jump to navigation Jump to search
Forwards Test Rept Re Auxiliary Feedwater Pumps Endurance Run.Util Reviewing Case of turbine-driven Pump Bearing Exceeding Bearing Temp Acceptance Criteria
ML19340B531
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/04/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19340B532 List:
References
NUDOCS 8011110239
Download: ML19340B531 (1)


Text

. -

TENNESSEE VALLEY AUTHORITY CH ATTANOOG A, TENN ESSCE 37401 400 Chestnut Street Tener II ;i T49977g3

'.S Udi November 4, 1900 W O NOV 10 P!4 3 5?

Pr. Harold R. Denten, Director . . , -

Office of Hu.: lear Reactor Regulation C P L' I ' .kf jfSERWCES U.S. Nucle. Regulatory Co;cission 'EAHCH Washington, DC 20555

Dear Pr. Denton:

In the Patter of ) Docket No. 50-327 Tennessee Valley Authority )

The auxiliary feedwater pumps (AFP) at Sequoyah Nuclear Plant unit 1 successfully completed a 48-hour endurance run as required by operating license condition 2.C.22.E and 101C Task Action Plan item II.E.1.1.

Enclosed for your review is the test report for the AFP endurance run. As noted in the test report, one of the turbine-driven punp bearings exceeded the seceptance criteria fer bearing temperature. TVA is reviewin6 this anomaly and will report its resolution to the NRC.

Very truly yours, TEENESSEE VALLEY AUTHORITY M. !! ills, l'anager Nuclear Rcgulation and Sarcty --

Sworn to 7d cubscribed bercre v.c this h - day cf d b A 1980 o d ifL T Jotary Public 4AckAE

!!y Cornission Expires [-

Enclosure (15) l l

An tqual Opportunity Employev

, _