Narrative Summary of Plant Operation 10-1 to 10 Continuous operation at approximately 97 percent. Performed routine surveillance and preventive maintenance items.
10-28 0357 Reactor trip as a result of feedwater flow imbalance brought about by loss of instrument air pressure.
0638 Reactor critical 1200 Latched turbine 1436 Closed OCB's 1600 Reactor at 43 percent 2952 Began increasing power to 93 percent 2350 Reactor at 88 percent. Began 2-hour hold.
10-29 0309 Reactor at 88 percent.
End hold.
Increasing power to 93 percent.
0350 Reactor at 93 percent.
10-30 1145 Reactor at 96 percent 10-31 Reactor at 96 percent Major Items of Safety-Related Maintenance No items of safety-related maintenance were completed in October, 1980.
Personnel Changes Requiring Reporting No personnel changes that require reporting in accordance with Technical Specification, Figure 6.9-2 were made in October, 1980.
801111.0 226
Summary of Changes Made in Accordance with 10 CFR 50.59(b) 1.
Modification to remove safety features initiation signal from RCP scal-injection valve (SFV-23616) to prevent damage to RCP's which would result from tene.ination of seal injection as a result of tr!poing all 4 RCP's upon a safety features initiation signal.
2.
Moved the starting of diesel-generator supply and exhaust fans from block 2 to block 3 in the Nuclear Service bus loading scheme to prevent the voltage at the terminals of motors (on buses 3A and 3B) f rom dropping below 345 volts during block 2 loading.
3.
Changed setpoints of relays 427FA and 427FB to 3,744 volts and setpoint of relay 459 to 4,576 volts to ensure safe operation of safety equipment at the minimum and/or moximum expected bus voltages.
9
CYCLE 4 POIER DISTRIBUTION COMPARISON In the District's letter to Mr. Robert W. Reid, dated February 27, 1980, Rancho Seco committed to perform Power Distribution Comparisons reload core utilizing through Cycle 4 as a result of this being the first Lumped Burnable Poisons.
tlc next data is to be taken at near 150 EFFD, which is anticipated to occur in November, 1980.
i i
OPERATING DATA REPORT DOCKETNO.
50-312 D\\TE 10 '11-80._
CO%IPLETED BY R. Colombo TELEPlf0NE (916) 452-3211 OPERATING ST A70s N "'
- 1. Unit Narr.e:
Rancho Seco Unit No. 1
- 2. Reportic; Pened: October, 1980
- 3. Itcnsed Thennai Power estu:i:
2.772
- 4. Nameplate Ratm; eGross.'.the r 963
- 5. Design Ele:trical R: tine iNet '.lhes:
918
- 6. >!asimum Depend b e C.'pae;ty egress.\\lWe):
9I7
- 7..\\faximum Dependable Capacity (Net 31We):
873
- 8. If Changes Occur in Caxcity Rat:np items Number 3 Throu;h 7)Since Last Report. Ghe Reasons:
N/A
- 9. Power Leve! Tc hhich Restricted. If 2.nv iNet.\\lWel:
.N/A
- 10. Reasons for Restnerions.lf Any:
N/A This 3!onth Yr.-to Date Cumulatise s
I1. Ilou:s in Ryort.n; Period 745 7.320 48.577
- 12. Number Ofliour> Re ctor Was Critical 742.3 3.958.7 30.032.2
- 13. Reactor Res.ne Shutdown flours 0
494.5 4.469.6
- 14. Hours Gener: tor on-Line 734.4 3.840.3 28.781.6
- 15. Unit Rewne Shdditr.sn Hotes 0
0 1,210.2
- 16. Gross lherral Ener;y Generated \\li.~H) 1.945.244 9.965.408 72.999,106
- 17. Gron Ele..rical Ene:gy Generated 13:ntti 653.405 3,320,891 24,605,427
- 18. Net Electri::! Energy Generared i.\\lb Hi 620.687 3.134.900 23.245.789
- 19. Unit S. nice Factor 98.6 52.5 59.2
- 20. Unit Assil.di'ity Fa: tor 98.6 52.5 61.7
- 21. Unit Cap.icity Factor IU>in; 3!CC Neti 95.4 49.1 54.8
- 22. L' nit Ccei:3 Factor iU3ing DER Net, 90.8 46.7 52.1
- 23. Unit Foreid Outap Rate 1.4 13.6 30.0
- 24. Shutdown > Scheduled Oser Nest o stonths iT)Pe.Date,and Duration of Eachr Refueling Outage in May, 1981:
= 45 days
- 25. If Shut Dodn At End Of Rep.irt Period. E 'i:nated D2:e oiStartup:
N/A
- 26. Unit,la Tot Status Prior to Co:omercial Optrationi:
Forcea :
Achiesed INITist CR!1lC \\LITY N/A N/A
- INITI st Ft I CTRict ry N/A N/A Cosisil.1:ct \\L ovr R \\ il0N N/A N/A
("/77 )
REFUELING INFORMATION REQUEST 1.
Name of Facility:
Rancho Seco Unit 1 3
2.
Scheduled date for next refueling shutdown:
Mav. 1981 3.
Scheduled date for restart following refueling:
June, 1981 4.
Technical Specification change or other license amendment required:
a) Change to Kod Index vs. Power Level Curve (TS 3.5.2) b)
ChangetoCoreImbalancevs.PowerLevelChrve(TS3.5.2) c) Tilt Limits (TS 3.5.2)'
5.
Scheduled date(s) for submitting preposed licensing action:
March. 1981 6.
Important licensing considerations associated with refueling:
None 7.
Number of fuel assemblies:
a) In the core:
177 b)
In the Spent Fuel Pool:
164 8.
Present licensed spent fuel capacity:
579 9.
Projected date of the last refueling that can be dischatged
~
to the Spent Fuel Pool:
1987
V AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-312 UNIT -Rancho Seco Unit 1 DATE 31-80 COMPLETED By
_R.
Colombo TELEP110NE -_(916) 452-3211 MONTil October, 1980 DAY AVERAGE DAILY POb ER LEVEL DAY AVER AGE DAILY POWER LEVEL O!We Net)
Mwe. Net) 1 814 17 887 2
827 is 870 3
836 39 863 4
832 20 865 S
845 23 864 6
848 22 863 7
865 23 875 f
a 871 24 863 9
881
,2$
868 10 870 26 866 II 887 27 866 i
12 886 5
28 308 33 886 29 814 14 891 30 840 15 RR9 31 865 -
16 888 INSTRUCTIONS On this fornu:, hst the averge daily unit p.iwer lesel in MWe Net for each day in the repo the ner.est uhele tn:pwatt.
h (ill?7i l
.i
O O
b DOCKET NO. 50-312 UNIT SliUTDOWNS AND POWER REDUCTIONS UNIT NA%1E Rancho Seco No. 1 DATE _10-31-80 COMPLE1 ED Isy R-Colombo REPORT MONTif October. 1980 TELEPl!ONE (916) 452-3211 1
I
'd E
5?
S=
[, E E Licer.sce
,E g, f,
Cause & Corrective No.
Date g,
3g
(
,3 g 5 Event u?
al Action to
$5 5
Ji ;f, 5 Report #
NU 5V Prevent Recurrence P
u g
O 8
10-28-80 F
10.6 A
3 N/A PA AIRDRY Loss of instruen air pressure resulted in feedenter flow imbalance which, in tura, led to reactor trip.
Il GES
- p (EME' C3 m
0 0
6 9
i 2
3 4
F: Forced Reason:
Meth'>d:
Exhibit G. inst-. tion s S: Stheduled A tvu;rment Failure (Explain) 1-Manual for Preparatior. 4 Dai.:
It M-iintenmee oiTest 2 Manual Scram.
Entry Sheets for 1.icensee C Refucting 3 Automatic Scram.
Event Report (LI.RI File (NUREG-D.Rer.ulatosy Restriction 4 Other (Explain) 0161)
I?-Oper.itor Training & Liecuse Examination F Adnuni,trative 5
G Operation 4! Error (Explain)
Exhibit I.Same Source (9/77)
Il Other (Explain) 9 C
,