ML19340B303

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Control Switches Are Not in Use at Facility
ML19340B303
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/08/1980
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-80-20, NUDOCS 8010210768
Download: ML19340B303 (1)


Text

x

.. - bec to DAC:ADM:

. E. I CEfiTRAL FZLES

. . PDR:HQ LPDR

-ttr 4 .NSIC Omaha-Public Power District '7 1623 HARNEY a OMANA. NEBRASKA 68102 4 TELPPHON E S36-4000 art g August 8, 1980 Mr. K. V. Seyfrit, Director U. S. Nuclear Regulatory Comission Region IV 611 Ryan Plaza Drive Suite.1000 Arlington, Texas 76011

Reference:

Docket No. 50-285 l l

Dear Mr. Seyfrit:

i l

The Omaha Public Power District received IE Bulletin 80-20, dated

July 31, 1980, regarding failures of Westinghouse type W-2 control switches. The District has determined that no Westinghouse type W-2 l spring return to neutral control switches are in use at the Fort Calhoun Station Unit No.1.

,- Sincerely, i; ,';_h' W. C. Jones Division Manager Production Operations WCJ/KJM/BJH/TLP:jmm

! cc: Director l Division of Reactor Operations Inspection 1 Office of Inspection and Enforcement

! U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l :LeBoeuf, Lamb, Leiby & MacRae l 1333 New Hampshire Avenue, N. W.

i Washington, D. C. 20036 I

8910210 e