First Interim Deficiency Rept Re Analysis of Intermediate Pipe Break Locations Resulting in Break Locations Shift.Util Is Evaluating Possible Consequences of Postulated Breaks for RHR Sys
ML19340B174
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/16/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, NCR-SQN-CEB-802, NUDOCS 8010210590
Download: ML19340B174 (2)


Text

_.

D D

D

,377 400 Chestnut Street Tcwer.II Cotober 16, 1980

' Mr. James P. C. eilly, Director Office of Inspect on and Enforcement U.S. Nuclear Regula(ory Cocmission Tiecien II - Suite 31 101 Lu'ietta Street Atlanta, Georgia ~30303

Dear.Mr. 0'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - ANALYSIS OF INTERII:DIATE BREAK LOCATIONS -

NCR SQU CEB 8027 - FIRST INTERIM REPORT Ihe subject deficiency was initially reported to URC-0IE Inspector M. Then.as en September 18, 1980, in accordance with 10 CFR 50.55(e).

Enclosed is cur first interin report. We expect to submit our next repcrt by December 8, 1980.

If you have any questions, please get in touch with D. L. Lambert at FTS 47-2581.

Ver" truly yours,

'"E:!I:ESSEE V!1 LEY AUTHORITY L. If. Mills, Manager Nuclear Regulatien and Safety Enclosure f

-cc:

Mr. Victor Stello, Director (Enclosure),V

~

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission WashinSton, DC 20555-f t8 010216 3810

ie '

. ENCLOSURE:

- SEQUOYAH NUCLEAR PLANT UNIT 2-ANALYSIS OF -INTERMEDIATE BREAK LOCATIONS NCR SQN CEB 8027 10 CFR 50.55(e)

FIRST-INTERIM REPORT r

Descriotion of Condition A reanalysis of some intermediate pie as'ak' locations performed'in 1979' by EDS Nuclear resulted in a shifting of ' reak locations on the following lines:.(1) Safety Injection (SI). Cold Leg Injection Loop 4; (2) Residual-Heat Removal!(hER) Hot Leg Recirculation Line; and (3) Resistance Temperature Device (RTD)~ Line Lcop 2.

EDS did not revise the brer:

locations en;the affected isometric - drawings ano tid not. notify T'..'

of the break location changes. As a result, the location of pipe. break restraints - for these lines may be deficient.-

Corrective Action' The SI and RTD lines have been reevaluated and 'no unacceptable interactions were found. TVA is presently conducting an evaluation'of the possible con-sequences of the postulated breaks for the RHR system.

+