Forwards Bulletin 74-10A, Failures in 4-Inch Bypass Piping at Dresden 2. Action Not Required,If OL Does Not Authorize Use of BWR of jet-pump Design
ML19340B058
Person / Time
Site: Dresden, Zion, LaSalle  
Issue date: 12/18/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 8010170768
Download: ML19340B058 (1)


Text

__ _ _____

UNITED STATES

{f.

ATOMIC ENERGY COMMISSION 1.s e

%, /

/( g DIRECTORATE OF REGULATORY OPERATIONS REGION lli o # rts o' 4

799 ROOSEVELT ROAD mmg GLEN ELLYN, ILLINOIS 60137 (312) ass-2640 m ec 1 8 1974 Commonwealth Edison Co w Docket No. 50-10 ATIN: Mr. Dyros Lee, Jr.

Deckat No. 50-295 Vies President Docket Wo, 50-304 P. O. Bau 767 Docket No. 50-373 Chicase, 7114mmis 60690 Decket No. 50-374 Gentlemma Enclosed is E0 h11atia 76-10A which is forwarded to you for information.

No acties is required of you if you de act have a boiling water reactor of jet-yemy design with operating lisease.

Should you have questicas regarding this Bellatia, please contact this offiae.

Sincerely yours, Jannes G. Kappist R=*4 - 1 Director Eacleeures 30 Dallatia 74-10A l

Appened by GAO, 5-180225 (20072), riaavance espires 7/31/77.

Approval was given under a blankst clearance specifically for identifind gameria problans.

bec:

Central Files RO Files PDR Local FDR A. Roissan D

b

.,s

~

s December 18, 1974 DRO Bulletin No.74-10A FAILURES IN 4-INCH BYPASS PIPING AT DRESDEN-2

(

REFERENCE:

RO BULLETIN NO. 74-10, DATED 9/19/74)

DESCRIPTION OF CIRCUMSTANCES (AMENDED):

The Commonwealth Edison Company notified the Region III Office of the Directorate of Regulatory Operations by telephone on December 13, 1974, of the finding of additional through-wall cracks in the 4-inch diameter bypass loop around the discharge valve of the "B" recirculation pump at the Dresden-2 facility. The circumferential cracks were located adjacent to the heat affected zone of a weld which joins the "B" bypass locp piping to a' weldolet fitting on the 28-inch diameter main coolant recir-culation piping.

The cracks were revealed during a planned ultrasonic reexamination of the bypass piping as a part of the inservice inspection program at Dresden-2.

Similar ultrasonic examination of the same weld in mid-September 1974 revealed no evidence of cracks at that time.

a The Dresden-2 facility is currently shut down for refueling.

All welds in the 4-inch bypass piping are to be reexamined during this shutdown.

The licensee is evaluating the significance of the cracks which have l

been detected as well as procedures for their repair.

ACTIONS REQUESTED OF LICENSEES (AMENDED):

l For all boiling water reactor facilities of jet-pump design with operating license:

1.

Reevaluate the results of ultrasonic and other examinations con-ducted previously in response to R0 Bulletin 74-10 or as part of i

the baseline inservice inspection for those facilities not examined in response to R0 Bulletin 74-10.

Notify this office by telephone by December 23, 1974, and reaffirm in writing by December 30, 1974, of the results of your reevaluation.

I 2.

Reexamine (by ultra,onic or other suitable volumetric inspection technique) all accessible welds in the bypass piping lines around the recirculation pump discharge valves at the earliest of the following conditions:

Lf j 7';>rgt):t(;(l)u i:S

-- ~

~

w

, 'o

~

DRO Bulletin No.74-10A If presently at cold shutdown and scheduled to remain in this.

1 a.

condition for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or more, prior to resuming power operation.

1 b.

If presently at a condition other than cold shutdown, at such time that (within the sensitivity specified in paragraph C.5.

of Regulatory Guide 1.45) any reactor cooltnt leakage detection system indicates, within a period of four hours or less, either an increase in unidentified leakage to twice the determined normal rate of unidentified leakage or an increase.in the rate of unidentified leakage by two (2) gpm or more.

(In no case, however, shall the rate of leakage exceed that specified in the technical specifications without those actions required of the technical specification being taken.)

c.

Next cold shutdown, regardless of duration.

Notify this office in writing, within 10 days following their completion, of the results of the reexaminations conducted in response to this Bulletin. Your written notification should also include a brief description of the examination technique and procedures employed, as well as a description of any special engineering disposition or repairs necessitated by the results of these reexaminations.

A copy of all written notifications to this office (including all attachments) should be sent to the Assistant Director for Construction and Operations, Directorate of Regulatory Operations, AEC Headquarters in Washington, D. C.