ML19340A975
| ML19340A975 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 08/11/1975 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19340A976 | List: |
| References | |
| NUDOCS 8009150635 | |
| Download: ML19340A975 (3) | |
See also: IR 05000010/1975014
Text
'
- - - - . - . _ -
,
,
__
'
_-
- . _ , . _ _ .
.
n~.--
-
. . - .
- -
%
.
.,
.
.'
UNITED STATES
w
g
}
NUCLEAR REGULATORY COMMISSION
REcloN 111
CLEN ELLYN, ILLINOl$ 60137
.
f
.
l
AUG 1 1 1975
" - Docket No. IMh
'
Coissonwealth Edison Cocipany
AT22I: Mr. Byron Lee, Jr.
Docket No.10-237
Vice President
Docket No. 50-249
P. O. Box 767
Chicago, Tilhis
60690
Centlemen:
This refers to the inspection conducted by Mr. M. C. Schumacher of
this offica on June 10-11, 16-17, 19-20, 30 July 1 and 14, 1975,
of activitics authorized by URC Operating License Nos. DPR-2,
No. DPR-19, and No. DPR-25 and to the discussion of our findings
with Mr. Stephenson and cenbers of his staff at the conclusion of
the inspection.
A copy of our report of this inspection is enclosed and identifies the
arens nnnined during the inspection. Within these arcas, the inspection
consisted of a selective e m ination of procedures and representative
records, inte:: views trith plant personnel, and obcorvations by the
-
inspector.
During this inspection, it was found that certain of your activities
appear to ha in ncncot:pliance with URC requirements. The ite=s and
reference to the pertinent rcquirenonts are listed under Ihforce=ent
Itecs in the Suc=iary uf Findings Section of the enclosed inspection
report. Prior to the conclusion of the inspection, tha inspector
determined that corrective action had been talma with respect to
Enforcement Itca B and that neasures had been taken to assure that
a chitar, futuro noncomplicnce will be avoided. Consequently, no
reply to this iten is required, and we have no further questions
regarding-this catter at this time.
This notico is sent to you pursuant to the provisions of Section 2.201
of the UPC's " Rules of Practice," Part 2, Titio 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
.
l
twenty days of your receipt of this notice, a written statement or
a.xplanation in reply, including: (1) corrective steps which have been
!
-
>
4otuTio,
S 'h *b
i
'
r
We.w16
-
8 009150 6'3r
Q 0d3$@]{$
-
l
.
. . '
~.- -.. ..
~~
. - -
-- l
-
. -
- -
1
l
i
.
,
'
.
commonwealth Edison
-- 2 -
AUG 1 1 1975
Company
-
/^
.
.
take by you, and the results achieved; (2) corrective steps which will
be taken to avoid further items of noncompliance; and (3) the dete when
full compliance will be achieved. Such a statement.or explanation
should be provided for items A.1 and A.2.
Based on discussions with your management p ~sonnel at the site,
we understand that you plan to:
1.
Install a well by nid August to monitor water table level and
radioactivity concentration near the Unit I rndwasta vault.
2.
Remove water and solids from the Unit I radwaste vault ' floor
within the next three months and visually inspect for crachs.
,
3.
Innta11 instrumentation and equipment to pernic operation
-
without tank overflows to the Unit i radwaste vault floor uithin
a year.
.
4.
Monitor for ground vater scepage into the Unit I radwaste vault.
5.
Evaluate the cztent of surface contaninntion east of the raduaste
bn41 Aing and take appropriate corrective action.
6.
Naka a procedure change to improve survef11nnce and reporting of
Unit 1 chimney flow anomalies.
7.
Make procedure changes to ensure coordination between instrument
maintenance and radiation chc=1stry personnel with regard to
monitor set point changes.
8.
Complete insenllation of new liquid monitors as soon as prac-
ticable.
We will crnmine these matters during subsequent inspections.
This inspection also included a review of your actions with respect
to co=mitncnts discussed in our letters of April 23, July 15, and
September 3, 1974. Except for the item related to approval of res-
piratory protective equipment, on which action is continuing, we have
no further questions regarding these matters.
,
,
i
P908 MMNAL
.
-
.
,
._
. _ _
-
l.!
.
.
s
Commonwealth Edison
-3-
Company
-
i
.
In accordance with Section 2.790 of the NRC's " Rules of Practico," Part
2, Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this'hotice will be
placed in the NRC's Public Document Room. If this report contains any
infor=atzon that you or your contractors believe to be proprietary. it
is necessary that you make a writte,4 application to this office, within
twenty days of your receipt of thf a notice, to withhold such information
from public disclosure. Any such application mest include a full statement
of the reasons for which it is claimed that the infor:ntion is proprietary,
and should be prepared so the proprietary infornation identified in the
application is contained in a separate part of tha doctrient. Unicss va
receive an application to trithhold information or are otherwise contacted
within the specified time period, the written material identified in
this paragraph will be pinced in the Public Document Room.
Should you'have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
_
Gaston Fiorelli, Chief
Reactor Operations Branch
Enclosure:
IE Inspection Rpt Nos'. 050-010/75-14
and No. 050-237/75-20, and
No. 050-249/75-16
cc w/ene*: